Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project include approx. 4,250 feet of 12-, 8-, and 6" welded steel pipe with valves, fittings, pipe disinfection, and appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Water supply pipeline improvement.
Posted Date
Jan 3, 2026
Due Date
Jan 27, 2026
Release: Jan 3, 2026
Close: Jan 27, 2026
Water supply pipeline improvement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pump station replacement project: General Construction 2026-01- Demolition of the existing Pine Hollow Pump Station, including all associated structures, and construction of a new triplex submersible pump station with associated piping, valves, electrical equipment, controls, and site improvements to provide a complete and fully functional pump station capable of conveying the specified design capacity. The work shall be performed in a phased manner to maintain continuous operation of the existing station and shall include all startup, testing, and commissioning required for full operational readiness. General contractor will be responsible for furnishing select electrical items including, but not limited to, programable logical controller (PLC), grinder control panel, motorized slide gate equipment, and instrumentation as defined in Divisions 40 and 46. All demolition will be part of the General Construction Contract. 2026-02 Electrical Construction: Furnish and install all electrical systems, equipment, and appurtenances required for the complete and fully functional operation of the Pine Hollow Pump Station, including new generator, automatic transfer switch (ATS), disconnects, motor control centers, variable frequency drives, control wiring, and associated conduit, cable trays, and raceways. Work shall include integration with mechanical systems, coordination with existing electrical infrastructure, coordinating temporary and permanent power with the utility provider, and all required testing, startup, and commissioning to ensure reliable operation of all electrical and control systems. Electrical work shall be performed in accordance with applicable codes, standards, and the project phasing requirements to maintain continuous operation of the existing pump station until the new station is fully operational. Electrical Contractor will be responsible for coordinating internet service with current internet provider and providing necessary internet services to the proposed facilities. 2026-03 Mechanical Construction - Furnish and install all mechanical systems, equipment, and appurtenances required for the complete and fully functional operation of the Pine Hollow Pump Station, including a ductless split HVAC system, intake louver, and exhaust fan with associated ductwork, dampers, supports, and accessories. Work shall include coordination of mechanical installations with electrical, structural, and architectural trades, and shall provide for equipment access, maintenance clearances, and safe operation. All systems shall be installed, tested, balanced, and commissioned to ensure reliable performance under all anticipated operating conditions. Mechanical work shall comply with applicable codes and standards, manufacturer's recommendations, and the project phasing requirements to maintain continuous operation of the existing pump station until the new facility is fully operational.
Posted Date
Jan 16, 2026
Due Date
Mar 24, 2026
Release: Jan 16, 2026
Close: Mar 24, 2026
Pump station replacement project: General Construction 2026-01- Demolition of the existing Pine Hollow Pump Station, including all associated structures, and construction of a new triplex submersible pump station with associated piping, valves, electrical equipment, controls, and site improvements to provide a complete and fully functional pump station capable of conveying the specified design capacity. The work shall be performed in a phased manner to maintain continuous operation of the existing station and shall include all startup, testing, and commissioning required for full operational readiness. General contractor will be responsible for furnishing select electrical items including, but not limited to, programable logical controller (PLC), grinder control panel, motorized slide gate equipment, and instrumentation as defined in Divisions 40 and 46. All demolition will be part of the General Construction Contract. 2026-02 Electrical Construction: Furnish and install all electrical systems, equipment, and appurtenances required for the complete and fully functional operation of the Pine Hollow Pump Station, including new generator, automatic transfer switch (ATS), disconnects, motor control centers, variable frequency drives, control wiring, and associated conduit, cable trays, and raceways. Work shall include integration with mechanical systems, coordination with existing electrical infrastructure, coordinating temporary and permanent power with the utility provider, and all required testing, startup, and commissioning to ensure reliable operation of all electrical and control systems. Electrical work shall be performed in accordance with applicable codes, standards, and the project phasing requirements to maintain continuous operation of the existing pump station until the new station is fully operational. Electrical Contractor will be responsible for coordinating internet service with current internet provider and providing necessary internet services to the proposed facilities. 2026-03 Mechanical Construction - Furnish and install all mechanical systems, equipment, and appurtenances required for the complete and fully functional operation of the Pine Hollow Pump Station, including a ductless split HVAC system, intake louver, and exhaust fan with associated ductwork, dampers, supports, and accessories. Work shall include coordination of mechanical installations with electrical, structural, and architectural trades, and shall provide for equipment access, maintenance clearances, and safe operation. All systems shall be installed, tested, balanced, and commissioned to ensure reliable performance under all anticipated operating conditions. Mechanical work shall comply with applicable codes and standards, manufacturer's recommendations, and the project phasing requirements to maintain continuous operation of the existing pump station until the new facility is fully operational.
The City of Redding, California is soliciting proposals for construction management services for the Westside Road Bridge Over Canyon Hollow Creek Replacement Project.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
The City of Redding, California is soliciting proposals for construction management services for the Westside Road Bridge Over Canyon Hollow Creek Replacement Project.
AvailableSchool fire alarm replacement - project
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
School fire alarm replacement - project
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →