Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pump station replacement project: General Construction 2026-01- Demolition of the existing Pine Hollow Pump Station, including all associated structures, and construction of a new triplex submersible pump station with associated piping, valves, electrical equipment, controls, and site improvements to provide a complete and fully functional pump station capable of conveying the specified design capacity. The work shall be performed in a phased manner to maintain continuous operation of the existing station and shall include all startup, testing, and commissioning required for full operational readiness. General contractor will be responsible for furnishing select electrical items including, but not limited to, programable logical controller (PLC), grinder control panel, motorized slide gate equipment, and instrumentation as defined in Divisions 40 and 46. All demolition will be part of the General Construction Contract. 2026-02 Electrical Construction: Furnish and install all electrical systems, equipment, and appurtenances required for the complete and fully functional operation of the Pine Hollow Pump Station, including new generator, automatic transfer switch (ATS), disconnects, motor control centers, variable frequency drives, control wiring, and associated conduit, cable trays, and raceways. Work shall include integration with mechanical systems, coordination with existing electrical infrastructure, coordinating temporary and permanent power with the utility provider, and all required testing, startup, and commissioning to ensure reliable operation of all electrical and control systems. Electrical work shall be performed in accordance with applicable codes, standards, and the project phasing requirements to maintain continuous operation of the existing pump station until the new station is fully operational. Electrical Contractor will be responsible for coordinating internet service with current internet provider and providing necessary internet services to the proposed facilities. 2026-03 Mechanical Construction - Furnish and install all mechanical systems, equipment, and appurtenances required for the complete and fully functional operation of the Pine Hollow Pump Station, including a ductless split HVAC system, intake louver, and exhaust fan with associated ductwork, dampers, supports, and accessories. Work shall include coordination of mechanical installations with electrical, structural, and architectural trades, and shall provide for equipment access, maintenance clearances, and safe operation. All systems shall be installed, tested, balanced, and commissioned to ensure reliable performance under all anticipated operating conditions. Mechanical work shall comply with applicable codes and standards, manufacturer's recommendations, and the project phasing requirements to maintain continuous operation of the existing pump station until the new facility is fully operational.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The scope of work generally consists of the complete demolition and replacement of wastewater pump station. The new pump station will provide a wet well sized to reduce pump cycling, and the new building will be cmu with brick face and will include a standing seam metal roof.
Posted Date
Jan 20, 2026
Due Date
Feb 20, 2026
Release: Jan 20, 2026
Close: Feb 20, 2026
The scope of work generally consists of the complete demolition and replacement of wastewater pump station. The new pump station will provide a wet well sized to reduce pump cycling, and the new building will be cmu with brick face and will include a standing seam metal roof.
AvailableProcurement of design and bidding phase services for the Edgewater Acres Pump Station Replacement.
Posted Date
-
Due Date
Mar 26, 2026
Close: Mar 26, 2026
Procurement of design and bidding phase services for the Edgewater Acres Pump Station Replacement.
AvailableThe Town of Holliston is soliciting bids for the Pinecrest Pump Station Replacement. Bids are due on February 20, 2026 at 10:00 AM, as listed on COMMBUYS. The solicitation is active and posted on the Commonwealth of Massachusetts’ official procurement system.
Posted Date
Jan 16, 2026
Due Date
Feb 20, 2026
Release: Jan 16, 2026
Close: Feb 20, 2026
The Town of Holliston is soliciting bids for the Pinecrest Pump Station Replacement. Bids are due on February 20, 2026 at 10:00 AM, as listed on COMMBUYS. The solicitation is active and posted on the Commonwealth of Massachusetts’ official procurement system.
AvailableDemolition and replacement of natural gas generator for the pump station.
Posted Date
Jan 7, 2026
Due Date
Jan 29, 2026
Release: Jan 7, 2026
Close: Jan 29, 2026
Demolition and replacement of natural gas generator for the pump station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis