Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Hermitage Muncipal Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Hermitage Muncipal Authority
Pump station replacement project: General Construction 2026-01- Demolition of the existing Pine Hollow Pump Station, including all associated structures, and construction of a new triplex submersible pump station with associated piping, valves, electrical equipment, controls, and site improvements to provide a complete and fully functional pump station capable of conveying the specified design capacity. The work shall be performed in a phased manner to maintain continuous operation of the existing station and shall include all startup, testing, and commissioning required for full operational readiness. General contractor will be responsible for furnishing select electrical items including, but not limited to, programable logical controller (PLC), grinder control panel, motorized slide gate equipment, and instrumentation as defined in Divisions 40 and 46. All demolition will be part of the General Construction Contract. 2026-02 Electrical Construction: Furnish and install all electrical systems, equipment, and appurtenances required for the complete and fully functional operation of the Pine Hollow Pump Station, including new generator, automatic transfer switch (ATS), disconnects, motor control centers, variable frequency drives, control wiring, and associated conduit, cable trays, and raceways. Work shall include integration with mechanical systems, coordination with existing electrical infrastructure, coordinating temporary and permanent power with the utility provider, and all required testing, startup, and commissioning to ensure reliable operation of all electrical and control systems. Electrical work shall be performed in accordance with applicable codes, standards, and the project phasing requirements to maintain continuous operation of the existing pump station until the new station is fully operational. Electrical Contractor will be responsible for coordinating internet service with current internet provider and providing necessary internet services to the proposed facilities. 2026-03 Mechanical Construction - Furnish and install all mechanical systems, equipment, and appurtenances required for the complete and fully functional operation of the Pine Hollow Pump Station, including a ductless split HVAC system, intake louver, and exhaust fan with associated ductwork, dampers, supports, and accessories. Work shall include coordination of mechanical installations with electrical, structural, and architectural trades, and shall provide for equipment access, maintenance clearances, and safe operation. All systems shall be installed, tested, balanced, and commissioned to ensure reliable performance under all anticipated operating conditions. Mechanical work shall comply with applicable codes and standards, manufacturer's recommendations, and the project phasing requirements to maintain continuous operation of the existing pump station until the new facility is fully operational.
Posted Date
Jan 16, 2026
Due Date
Mar 24, 2026
Release: Jan 16, 2026
Hermitage Muncipal Authority
Close: Mar 24, 2026
Pump station replacement project: General Construction 2026-01- Demolition of the existing Pine Hollow Pump Station, including all associated structures, and construction of a new triplex submersible pump station with associated piping, valves, electrical equipment, controls, and site improvements to provide a complete and fully functional pump station capable of conveying the specified design capacity. The work shall be performed in a phased manner to maintain continuous operation of the existing station and shall include all startup, testing, and commissioning required for full operational readiness. General contractor will be responsible for furnishing select electrical items including, but not limited to, programable logical controller (PLC), grinder control panel, motorized slide gate equipment, and instrumentation as defined in Divisions 40 and 46. All demolition will be part of the General Construction Contract. 2026-02 Electrical Construction: Furnish and install all electrical systems, equipment, and appurtenances required for the complete and fully functional operation of the Pine Hollow Pump Station, including new generator, automatic transfer switch (ATS), disconnects, motor control centers, variable frequency drives, control wiring, and associated conduit, cable trays, and raceways. Work shall include integration with mechanical systems, coordination with existing electrical infrastructure, coordinating temporary and permanent power with the utility provider, and all required testing, startup, and commissioning to ensure reliable operation of all electrical and control systems. Electrical work shall be performed in accordance with applicable codes, standards, and the project phasing requirements to maintain continuous operation of the existing pump station until the new station is fully operational. Electrical Contractor will be responsible for coordinating internet service with current internet provider and providing necessary internet services to the proposed facilities. 2026-03 Mechanical Construction - Furnish and install all mechanical systems, equipment, and appurtenances required for the complete and fully functional operation of the Pine Hollow Pump Station, including a ductless split HVAC system, intake louver, and exhaust fan with associated ductwork, dampers, supports, and accessories. Work shall include coordination of mechanical installations with electrical, structural, and architectural trades, and shall provide for equipment access, maintenance clearances, and safe operation. All systems shall be installed, tested, balanced, and commissioned to ensure reliable performance under all anticipated operating conditions. Mechanical work shall comply with applicable codes and standards, manufacturer's recommendations, and the project phasing requirements to maintain continuous operation of the existing pump station until the new facility is fully operational.
AvailableHermitage Muncipal Authority
Gabion Wall Repair.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Hermitage Muncipal Authority
Close: Jan 27, 2026
Gabion Wall Repair.
AvailableHermitage Muncipal Authority
Sanitary Sewer. Including 850 LF of 12" PVC gravity sewer with bedding; 170 LF of 6" PVC gravity sewer lateral with bedding; 170 LF of 6" utility excavation and backfill 0'-8' deep; 175 LF of 12" utility excavation and backfill 0'-8' deep; 675 LF of 12" utility excavation and backfill 8'-12' deep; 1 ea connection to existing manhole; 27 VF 4-foot diameter manhole; 75 LF of 6" gravity sewer lateral - horizontal auger boring; 50 LF of 12" gravity sewer main - horizontal auger boring (alternate placement); 120 SY paved driveway restoration, base; 5 LF concrete curb; 40 SY municipal road restoration; 5 Sy replace unsuitable bearing material; 5 Cy special stone backfill; 5 CY miscellaneous concrete; 2 ea repair of unmarked utilities.
Posted Date
Jan 24, 2025
Due Date
Feb 14, 2025
Release: Jan 24, 2025
Hermitage Muncipal Authority
Close: Feb 14, 2025
Sanitary Sewer. Including 850 LF of 12" PVC gravity sewer with bedding; 170 LF of 6" PVC gravity sewer lateral with bedding; 170 LF of 6" utility excavation and backfill 0'-8' deep; 175 LF of 12" utility excavation and backfill 0'-8' deep; 675 LF of 12" utility excavation and backfill 8'-12' deep; 1 ea connection to existing manhole; 27 VF 4-foot diameter manhole; 75 LF of 6" gravity sewer lateral - horizontal auger boring; 50 LF of 12" gravity sewer main - horizontal auger boring (alternate placement); 120 SY paved driveway restoration, base; 5 LF concrete curb; 40 SY municipal road restoration; 5 Sy replace unsuitable bearing material; 5 Cy special stone backfill; 5 CY miscellaneous concrete; 2 ea repair of unmarked utilities.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.