Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Water supply pipeline improvement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of Rural Water System Project – RW1A Pipeline.
Posted Date
Nov 5, 2025
Due Date
Feb 25, 2026
Release: Nov 5, 2025
Close: Feb 25, 2026
Construction of Rural Water System Project – RW1A Pipeline.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
To provide professional services for design and preparation of bid documents and construction support for improvements to the aged primary effluent pipeline at their Water Pollution Control Plant (WPCP). The primary scope of work includes design and bidding/construction/commissioning support. Project management, Conducting workshops, Preparing NEPA and CEQA documentation.
Posted Date
Nov 5, 2025
Due Date
Jan 12, 2026
Release: Nov 5, 2025
Close: Jan 12, 2026
To provide professional services for design and preparation of bid documents and construction support for improvements to the aged primary effluent pipeline at their Water Pollution Control Plant (WPCP). The primary scope of work includes design and bidding/construction/commissioning support. Project management, Conducting workshops, Preparing NEPA and CEQA documentation.
AvailableWork includes the installation of approx. 18,500' of water reuse pipelines from the city wastewater treatment plant, sizes ranging from 6" to 12". In addition to the water reuse pipeline, this project also includes the reconfiguration of the mall entrance drives, by closing in certain entrances as shown in the plans. 1 ls mobilization (not to exceed 3% of total bid), complete in place, the sum of; 1 ls traffic control and regulation, complete in place, the sum of; 1 ls critical investigation work (includes locating existing underground utilities and pipelines as needed to facilitate water line construction), complete in place, the sum of; 52 ea inlet protection barrier, complete in place, the sum of. See attached file.
Posted Date
Dec 19, 2025
Due Date
Jan 15, 2026
Release: Dec 19, 2025
Close: Jan 15, 2026
Work includes the installation of approx. 18,500' of water reuse pipelines from the city wastewater treatment plant, sizes ranging from 6" to 12". In addition to the water reuse pipeline, this project also includes the reconfiguration of the mall entrance drives, by closing in certain entrances as shown in the plans. 1 ls mobilization (not to exceed 3% of total bid), complete in place, the sum of; 1 ls traffic control and regulation, complete in place, the sum of; 1 ls critical investigation work (includes locating existing underground utilities and pipelines as needed to facilitate water line construction), complete in place, the sum of; 52 ea inlet protection barrier, complete in place, the sum of. See attached file.
AvailableProvide construction management at risk (cmar) services to assist rwrd to enter into construction contracts to build the water system improvement program consisting of a surface water intake, tunnel, raw water pump station, raw water transmission pipeline, water treatment plant, and potable water transmission.
Posted Date
Nov 26, 2025
Due Date
Feb 5, 2026
Release: Nov 26, 2025
Close: Feb 5, 2026
Provide construction management at risk (cmar) services to assist rwrd to enter into construction contracts to build the water system improvement program consisting of a surface water intake, tunnel, raw water pump station, raw water transmission pipeline, water treatment plant, and potable water transmission.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →