Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removing and replacing skylights.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of approx. the removal and replacement of campus center roof and skylights; see outside link for more details.
Posted Date
Jan 14, 2026
Due Date
Feb 5, 2026
Release: Jan 14, 2026
Close: Feb 5, 2026
Work consists of approx. the removal and replacement of campus center roof and skylights; see outside link for more details.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1. The current roof system and skylights must be demolished and removed from the building. 2. The contractor shall properly install a new system. 3. New skylights must be fabricated and installed on the garage roof. Remove existing roofing membrane, insulation, deteriorated blocking, and all interference debris to the roof deck. 1. Completely demolish and designated roofing and related materials. 2. Debris, including ballast stone, metals, roofing felts, insulation, wood and similar materials shall become property of contractor and shall be disposed of by him daily shall be stored in areas specified. Contractor shall dispose debris in compliance with applicable federal, state or local permits, and/or regulations. 3. Remove and legally dispose of all materials, other than earth to remain as part of project work, from any trash dumps shown. Materials removed shall become property of the contractor and shall be disposed of in compliance with applicable federal, state or local permits, rules and/or regulations be hauled to acceptable disposal site. 4. Completely demolish and remove skylights. Protect interior from water ingress while new skylights are being installed. See attached file.
Posted Date
Jan 15, 2026
Due Date
Mar 6, 2026
Release: Jan 15, 2026
Close: Mar 6, 2026
1. The current roof system and skylights must be demolished and removed from the building. 2. The contractor shall properly install a new system. 3. New skylights must be fabricated and installed on the garage roof. Remove existing roofing membrane, insulation, deteriorated blocking, and all interference debris to the roof deck. 1. Completely demolish and designated roofing and related materials. 2. Debris, including ballast stone, metals, roofing felts, insulation, wood and similar materials shall become property of contractor and shall be disposed of by him daily shall be stored in areas specified. Contractor shall dispose debris in compliance with applicable federal, state or local permits, and/or regulations. 3. Remove and legally dispose of all materials, other than earth to remain as part of project work, from any trash dumps shown. Materials removed shall become property of the contractor and shall be disposed of in compliance with applicable federal, state or local permits, rules and/or regulations be hauled to acceptable disposal site. 4. Completely demolish and remove skylights. Protect interior from water ingress while new skylights are being installed. See attached file.
AvailableThis RFP is for a reroofing project at Chualar Elementary School, including optional alternate scopes for gutters, downspouts, and skylight replacement.
Posted Date
Jan 9, 2026
Due Date
Feb 9, 2026
Release: Jan 9, 2026
Close: Feb 9, 2026
This RFP is for a reroofing project at Chualar Elementary School, including optional alternate scopes for gutters, downspouts, and skylight replacement.
AvailableReplacement of an irrigation pump station. Work include one 40hp pump, one 30hp pump, one 5hp auxiliary pump, one electrical control panel, one box framed skid for pump placement. Removal of the existing pumpstation includes: removing all current pumpstation pumps. Disconnecting the electrical control panel, removal of skylight, hauling the existing unit(s) away and proper disposal. Installation of the new pumpstation includes:lifting the pumps with a crane through the skylight, placing pumps in proper alignment with existing irrigation piping, installing new electrical control panel, connecting the existing piping to new pumps, connecting the electrical, installing skylight, start up and operational testing.
Posted Date
Jan 22, 2026
Due Date
Jan 31, 2026
Release: Jan 22, 2026
Close: Jan 31, 2026
Replacement of an irrigation pump station. Work include one 40hp pump, one 30hp pump, one 5hp auxiliary pump, one electrical control panel, one box framed skid for pump placement. Removal of the existing pumpstation includes: removing all current pumpstation pumps. Disconnecting the electrical control panel, removal of skylight, hauling the existing unit(s) away and proper disposal. Installation of the new pumpstation includes:lifting the pumps with a crane through the skylight, placing pumps in proper alignment with existing irrigation piping, installing new electrical control panel, connecting the existing piping to new pumps, connecting the electrical, installing skylight, start up and operational testing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →