Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Heather Gardens Metropolitan District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Treasurer
President
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Heather Gardens Metropolitan District
Replacement of an irrigation pump station. Work include one 40hp pump, one 30hp pump, one 5hp auxiliary pump, one electrical control panel, one box framed skid for pump placement. Removal of the existing pumpstation includes: removing all current pumpstation pumps. Disconnecting the electrical control panel, removal of skylight, hauling the existing unit(s) away and proper disposal. Installation of the new pumpstation includes:lifting the pumps with a crane through the skylight, placing pumps in proper alignment with existing irrigation piping, installing new electrical control panel, connecting the existing piping to new pumps, connecting the electrical, installing skylight, start up and operational testing.
Posted Date
Jan 22, 2026
Due Date
Jan 31, 2026
Release: Jan 22, 2026
Heather Gardens Metropolitan District
Close: Jan 31, 2026
Replacement of an irrigation pump station. Work include one 40hp pump, one 30hp pump, one 5hp auxiliary pump, one electrical control panel, one box framed skid for pump placement. Removal of the existing pumpstation includes: removing all current pumpstation pumps. Disconnecting the electrical control panel, removal of skylight, hauling the existing unit(s) away and proper disposal. Installation of the new pumpstation includes:lifting the pumps with a crane through the skylight, placing pumps in proper alignment with existing irrigation piping, installing new electrical control panel, connecting the existing piping to new pumps, connecting the electrical, installing skylight, start up and operational testing.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.