Open RFP

Silver Lake Sediment Removal and Dam Modification

Description: Said Construction generally consists of Dredging, Dam Modification, Shoreline Restoration, Pedestrian Trail, Retaining Walls, and Bridge Pier Construction . The work includes the following approximate quantities of work: Dredging: 208,000 CY mechanical sediment removal; Dam Modification (Rock Arch Rapids and Whitewater Wave Pools): Remove existing dam; 14,700 SF sheet pile; 24,400 CY excavation; 75,000 tons rock; 1,020 CY grout; 1.6-acres native seeding. East Shoreline Restoration : 21,800 CY excavation; 3.9-acres native seeding. Pedestrian Trail and Retaining Walls : 9,000 SF concrete walk; 570 LF concrete retaining wall; 1,570 SF soldier pile wall; 5,650 SF block retaining wall; 780 LF ornamental metal railing; 1,470 LF decorative fencing; 1.0-acre turf seeding; 0.5-acre native seeding. Bridge Pier: 45 CY structural concrete; 455 LF steel H-piling 14", 6,900 LB reinforcement bars.

Buyer
City of Rochester

City · MN, US

Released
Aug 4, 2026
Closes
Sep 9, 2026(33 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts