Closing soon

Kicking Horse Dam and Outlet Works Modification

Description: Construction of a cement-bentonite slurry cutoff wall through the embankment of the dam and dike #2, construction of a two-stage filter toe drain, rebuild of the dam crest and dike #2 crest, raising of canal road along the reservoir, construction of permanent and temporary access roads, removal and replacement of the existing outlet works, removal and replacement of the downstream check/wasteway structure in the ninepipe feeder canal, and relocation of g-canal downstream of the dam. This is just a summary of the main construction activities related to the project and the full description of the work to be performed can be found in the drawings and specifications. Description: 390,000 lb of concrete reinforcing; 500 LF of electrical conduit, PVC schedule 80, 3-inch diameter. See attached file.

Released
Jun 16, 2026
Closes
Aug 12, 2026(5 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts