CityCA
Jul 30, 2026
Closes
Aug 20, 2026
Annual Sidewalk, Curb, and Driveway Approach Improvement Project
Perform annual sidewalk, curb, and driveway approach improvements.
Description: Sidewalk, curb, and driveway apron restoration for the city.
City · NJ, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to City of Trenton.
These related opportunities are still open for bidding.
CityCA
Jul 30, 2026
Closes
Aug 20, 2026
Perform annual sidewalk, curb, and driveway approach improvements.
CountyCA
Aug 7, 2026
Closes
Sep 4, 2026
Work includes 1 EA sidewalk, curb & gutter and spandrel grinding; 1 EA sidewalk grinding e 5' or less (6-19 grinds at location); 1 EA sidewalk grinding -5' or less (20+ grinds at location; saturation of a mapped-out neighborhood/area).
CityOH
Aug 10, 2026
Closes
Aug 28, 2026
Sidewalk and minor roadway improvements in various neighborhoods.
OtherNJ
Jul 30, 2026
Closes
Aug 14, 2026
concrete sidewalk and curb replacement.