Open RFP

Shadow Mountain Water System Project (Water Main and Booster Pump Station)

Description: Construction of the water mains will include approximately 62 LF of 12" dia water main, 1,050 LF feet of 8-inch-dia water main and approx 670 LF of 4"-dia future reservoir fill line. Installation, connection, mechanical improvements, electrical and controls for county provided booster pump station. There will be domestic service connections and fire hydrants. The 4" mains will be installed from the existing reservoir, located just to the north of the high school, along a proposed easement just east of the existing property line and then within the existing roadway and utilities easement and terminate at halo rim drive. The 8" water mains will be installed along existing development roadway and utilities easements.

Buyer
Cowlitz County

County · WA, US

Released
Sep 3, 2026
Closes
Sep 28, 2026(18 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts