Posted
Oct 1, 2026
Nov 5, 2026
Oyster Point Sanitary Sewer Pump Station Relocation
work consist of 580 CY of existing pump station site grading, excavation dewatering treatment system, 60 EA of excavation dewatering, abandon existing ssv piping in place, 60 EA of temporary generator power operation, utility metering switchboard, pump station control system, instrument and control flow meter, electrical and instrumental demolition and modification, pump station lighting, pump station fencing and gate, 113 LF of 2" HDPE water line, 56 LF of 4" HDPE fire line
