Open RFP

Oyster Point Sanitary Sewer Pump Station Relocation

Description: work consist of 580 CY of existing pump station site grading, excavation dewatering treatment system, 60 EA of excavation dewatering, abandon existing ssv piping in place, 60 EA of temporary generator power operation, utility metering switchboard, pump station control system, instrument and control flow meter, electrical and instrumental demolition and modification, pump station lighting, pump station fencing and gate, 113 LF of 2" HDPE water line, 56 LF of 4" HDPE fire line

Buyer
Released
Oct 1, 2026
Closes
Nov 5, 2026(31 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts