Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the trenchless installation of approx. 45,000 LF of 8" HDPE, sanitary sewer and appurtenances, and the open-cut installation of approx. 600 LF of 8" sanitary sewer and appurtenances. The method to be used for the project will be pipe bursting, along with additional methods including cure in place and slip lining. The cure in place method will utilize ultraviolet light for curing the pipe.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of various improvements and replacement to the City's sewer mains. Project consists of replacing the existing sewer mains and reconnecting the active laterals, which shall include the excavation, removal of existing pipe, ¾” rock backfill & compaction, 1-sack slurry backfill, reconstruction of existing A.C. pavement and/or PCC concrete structures, restoration of all existing pavement striping and markings, and other appurtenant facilities as required.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
Work consists of various improvements and replacement to the City's sewer mains. Project consists of replacing the existing sewer mains and reconnecting the active laterals, which shall include the excavation, removal of existing pipe, ¾” rock backfill & compaction, 1-sack slurry backfill, reconstruction of existing A.C. pavement and/or PCC concrete structures, restoration of all existing pavement striping and markings, and other appurtenant facilities as required.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2025 sewer rehabilitation project.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
2025 sewer rehabilitation project.
AvailableThe Bloomington Sewer Expansion Project is an open market opportunity issued by San Bernardino Administration in California. The project involves the installation of approximately 4,900 feet of 8-inch-diameter PVC sewer main lines and 2,600 feet of 12-inch-diameter PVC sewer main lines in the Bloomington area of unincorporated San Bernardino County. Bidding for this project started on January 12, 2026, and proposals are due by February 12, 2026.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
The Bloomington Sewer Expansion Project is an open market opportunity issued by San Bernardino Administration in California. The project involves the installation of approximately 4,900 feet of 8-inch-diameter PVC sewer main lines and 2,600 feet of 12-inch-diameter PVC sewer main lines in the Bloomington area of unincorporated San Bernardino County. Bidding for this project started on January 12, 2026, and proposals are due by February 12, 2026.
AvailableThe purpose of this project is for the reconstruction of the sewer lines, which will include the demolition, construction and replacement of the existing sewer lines placed along 6th Street and the sewer lines.
Posted Date
Dec 8, 2025
Due Date
Jan 26, 2026
Release: Dec 8, 2025
Close: Jan 26, 2026
The purpose of this project is for the reconstruction of the sewer lines, which will include the demolition, construction and replacement of the existing sewer lines placed along 6th Street and the sewer lines.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →