Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of various improvements and replacement to the City's sewer mains. Project consists of replacing the existing sewer mains and reconnecting the active laterals, which shall include the excavation, removal of existing pipe, ¾” rock backfill & compaction, 1-sack slurry backfill, reconstruction of existing A.C. pavement and/or PCC concrete structures, restoration of all existing pavement striping and markings, and other appurtenant facilities as required.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
AvailableWork includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
Work includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
Project includes the trenchless installation of approx. 45,000 LF of 8" HDPE, sanitary sewer and appurtenances, and the open-cut installation of approx. 600 LF of 8" sanitary sewer and appurtenances. The method to be used for the project will be pipe bursting, along with additional methods including cure in place and slip lining. The cure in place method will utilize ultraviolet light for curing the pipe.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
Project includes the trenchless installation of approx. 45,000 LF of 8" HDPE, sanitary sewer and appurtenances, and the open-cut installation of approx. 600 LF of 8" sanitary sewer and appurtenances. The method to be used for the project will be pipe bursting, along with additional methods including cure in place and slip lining. The cure in place method will utilize ultraviolet light for curing the pipe.
AvailableSouth Coast Water District is requesting bids to remove and replace a portion of the existing gravity sewer main along Holly Drive in the City of Laguna Beach. Bids must be submitted electronically through the District's PlanetBids portal and require an electronic copy of the Bid Bond at submission (with a hard copy delivered to District offices within two working days after bid close). The project is estimated at approximately $250,000, with an estimated start date of 2026-05-01 and estimated completion by 2026-07-01.
Posted Date
Jan 15, 2026
Due Date
Feb 13, 2026
Release: Jan 15, 2026
Close: Feb 13, 2026
South Coast Water District is requesting bids to remove and replace a portion of the existing gravity sewer main along Holly Drive in the City of Laguna Beach. Bids must be submitted electronically through the District's PlanetBids portal and require an electronic copy of the Bid Bond at submission (with a hard copy delivered to District offices within two working days after bid close). The project is estimated at approximately $250,000, with an estimated start date of 2026-05-01 and estimated completion by 2026-07-01.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis