Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes, but is not limited to, extensive Lift Station No.1 yard piping with a new force main flow meter vault and a new Force Main bypass vault and appurtenances. The work also includes, but is not limited to, cleaning, repair of and installation of approx. 3,500 LF of CIPP lining in the existing Sewer Force Main No.1. Work includes traffic control, saw cut and pavement removal, access trenching, HDPE pipe reroute, bedding reconstruction, backfill and compaction and asphalt repair .
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement for the installation of a sewer lift station and sewer force main.
Posted Date
Jan 4, 2026
Due Date
Feb 6, 2026
Release: Jan 4, 2026
Close: Feb 6, 2026
Procurement for the installation of a sewer lift station and sewer force main.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project to include constructing approx. 16,000 LF of 8" PVC, force main and appurtenances.
Posted Date
Dec 25, 2025
Due Date
Jan 22, 2026
Release: Dec 25, 2025
Close: Jan 22, 2026
Project to include constructing approx. 16,000 LF of 8" PVC, force main and appurtenances.
AvailableConstruction for replacement of existing force main with approximately 2,900 LF of new 16" C900 PVC sewer force main with ductile iron fittings with mechanical restraint joint connections, along with appurtenances and other work incidental to the project as specified in the Contract Document and Project Plans.
Posted Date
Dec 21, 2025
Due Date
Jan 27, 2026
Release: Dec 21, 2025
Close: Jan 27, 2026
Construction for replacement of existing force main with approximately 2,900 LF of new 16" C900 PVC sewer force main with ductile iron fittings with mechanical restraint joint connections, along with appurtenances and other work incidental to the project as specified in the Contract Document and Project Plans.
AvailableWork includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Posted Date
Nov 23, 2025
Due Date
Jan 21, 2026
Release: Nov 23, 2025
Close: Jan 21, 2026
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;