Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
North Of River Sanitary Dist 1
Project includes expansion of existing preliminary and primary treatment, including new coarse screens, influent pumps, grit removal unit, primary clarifier and fine screens; construction of new secondary liquid treatment with new bioreactor coupled with membranes; expansion of existing anaerobic digestion capacity to include new anaerobic digesters, gas storage, expand screw press, new rotary drum thickeners, sludge pumping, gas storage, new potable and recycled water pumping systems, new plant drain pump station, repurpose secondary clarifier as new emergency storage tank and associated yard piping, new medium-voltage electrical distribution system and standby generators, electrical and controls integration; and all materials and equipment, construction, and services inherent to the Work.
Posted Date
Jul 22, 2026
Due Date
Sep 17, 2026
Release: Jul 22, 2026
North Of River Sanitary Dist 1
Close: Sep 17, 2026
Project includes expansion of existing preliminary and primary treatment, including new coarse screens, influent pumps, grit removal unit, primary clarifier and fine screens; construction of new secondary liquid treatment with new bioreactor coupled with membranes; expansion of existing anaerobic digestion capacity to include new anaerobic digesters, gas storage, expand screw press, new rotary drum thickeners, sludge pumping, gas storage, new potable and recycled water pumping systems, new plant drain pump station, repurpose secondary clarifier as new emergency storage tank and associated yard piping, new medium-voltage electrical distribution system and standby generators, electrical and controls integration; and all materials and equipment, construction, and services inherent to the Work.
AvailableNorth Of River Sanitary Dist 1
To provide professional Construction Management (CM) services for the District’s Water Resource Recovery Facility (WRRF) Expansion Project (Project).
Posted Date
May 13, 2026
Due Date
Jun 12, 2026
Release: May 13, 2026
North Of River Sanitary Dist 1
Close: Jun 12, 2026
To provide professional Construction Management (CM) services for the District’s Water Resource Recovery Facility (WRRF) Expansion Project (Project).
North Of River Sanitary Dist 1
Seeks operates and maintains a wastewater treatment plant (wwtp) serving residential, commercial and industrial customers. Work also consist of headworks expansion including three new mechanical screens, washer compactor, four new influent pumps, and a new shade structure with bridge crane , new odor treatment unit including biofilter trickling unit, rit removal expansion including one new grit hydrodynamic separator and grit classifier, primary clarifiers expansion including one new primary clarifier with sludge pumping, replacement of existing primary clarifier mechanism, and modifications to primary clarifier splitter box. See attached file.
Posted Date
Jan 14, 2026
Due Date
Mar 4, 2026
Release: Jan 14, 2026
North Of River Sanitary Dist 1
Close: Mar 4, 2026
Seeks operates and maintains a wastewater treatment plant (wwtp) serving residential, commercial and industrial customers. Work also consist of headworks expansion including three new mechanical screens, washer compactor, four new influent pumps, and a new shade structure with bridge crane , new odor treatment unit including biofilter trickling unit, rit removal expansion including one new grit hydrodynamic separator and grit classifier, primary clarifiers expansion including one new primary clarifier with sludge pumping, replacement of existing primary clarifier mechanism, and modifications to primary clarifier splitter box. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from North Of River Sanitary Dist 1
The board addressed several operational and financial matters, including the approval of general fund warrants and sewer contracts for construction within Tract 7296. Contracts were awarded for the Sanitary Sewer Rehabilitation Package B, the WWTP and Lift Station Electrical Facilities Maintenance Project, and the Outfall Sewer Rehabilitation Project. Additionally, the board approved a change order for the Sanitary Sewer Rehabilitation Package 27 and a proposal for digester gas treatment equipment. Authorizations were granted for the EPA WIFIA loan application and a LAFCO ballot submission. The meeting also included discussions regarding the WWTP Ad Hoc Committee, the MKN Preliminary Engineering Report for Highway 99 crossings, and the potential acquisition of agricultural land.
The agenda for the meeting includes several key items such as public comment, discussion of unpaid sewer service charges for a specific Assessor's Parcel Number (APN 118-030-24) involving a bar and residences, and the reorganization of the Board of Directors. Engineering proposals and contract documents are scheduled for approval concerning the Lift Station #1 Forcemain Rehabilitation Project. Additionally, the Board will address Notices of Completion and Exemption for various Outfall Sewer Rehabilitation phases, approve contract documents for Sanitary Sewer Rehabilitation Package B, and consider awarding bids for Package 28. Other topics include approval of a Change Order for WWTP maintenance and discussion of the WRRF Value Engineering Recommendations Report.
The Master Sewer Plan Update for North of River Sanitary District aims to assess current needs and investigate future requirements for the District's sewage collection and treatment systems through the year 2030. Key objectives include updating the plan for build-out conditions, refining the conceptual framework for municipal sewage conveyance, treatment, and effluent disposal, and estimating associated construction costs. The plan seeks to ensure the system can accommodate anticipated growth and maintain efficient wastewater management.
The agenda includes a public hearing and consideration of adopting a resolution for the District Sewer Service Charge, collection and counting of protests against increasing the sewer service charge, and discussion regarding Resolution 23-07 to adopt the increased charge. Further discussion includes the WWTP Ad Hoc Committee meeting, a public hearing to consider the adoption of the District budget for fiscal year 2023-2024, and the annual review of the District Reserve Fund balances. The agenda also covers the review of the District Investment Policy, discussion of proposed CSRMA Captive Insurance Company Formation, approval of a revised purchase price for a replacement heavy-duty maintenance truck, approval of the Ayala Engineering Inc. Change Order No. 4, approval of the Witcher Electric Inc. quote for Emergency Generator plugs, and approval for District Manager and Board Director(s) to participate in the Annual CASA and CSDA Conferences. Finally, the agenda includes discussion of proposed Staffing reorganization and matters of legal counsel.
The Board of Directors meeting included discussions and actions on various topics. The board reviewed financial reports, the manager's report, and approved the payment of general fund warrants. They also reviewed a quarterly summary of District investment activity. Approvals were granted for the Sanitary Sewer Rehabilitation - Package 23 CIPP Rehabilitation Project and the Sanitary Sewer Rehabilitation - Package 25 Remove and Replace Rehabilitation Project. The board approved contract documents and authorized advertising for bids for the S. Oildale Dr. Force Main #1 Rehabilitation Project. Additionally, they approved a proposal for engineering services for the Sewer System Management Plan Update, the 2025 District Sewer System Management Plan Update and Audit, and an amendment to Financial Consulting and Municipal Advisory Services. They also approved a sewer contract for a commercial site. A public hearing was held concerning District employment vacancies, recruitment, and retention efforts, followed by the approval of a modified District Engineer Job Description.
Extracted from official board minutes, strategic plans, and video transcripts.
Track North Of River Sanitary Dist 1's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge