Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The objective of this research is to evaluate the requirements for Service III limit state regarding design and load rating for tension in prestressed concrete bridge superstructure members to ensure consistency and reliability, while maintaining operational flexibility.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Bridge reconstruction including replacement with 21" prestressed concrete box beams and approach work.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Bridge reconstruction including replacement with 21" prestressed concrete box beams and approach work.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge reconstruction including replacement with 36" prestressed concrete i-beams, cip abutments and approach work.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Bridge reconstruction including replacement with 36" prestressed concrete i-beams, cip abutments and approach work.
AvailableTo furnish and deliver prestressed concrete voided slabs.
Posted Date
Dec 19, 2025
Due Date
Jan 5, 2026
Release: Dec 19, 2025
Close: Jan 5, 2026
To furnish and deliver prestressed concrete voided slabs.
AvailableWork consists of: construction engineering; clearing right-of-way; present structure, remove, structure no; sign, remove; excavation, common; borrow; stormwater management budget; stormwater management implementation; excavation, foundation, unclassified; subgrade treatment, type II; subgrade treatment, type IC; aggregate for end bent backfill; structure backfill, type 2; geotextile for pavement, type 2B; compacted aggregate, no. 53; QC/QA-HMA, 2, 58s, surface, 9.5 mm; guardrail terminal system, w-beam, curved, type 2; guardrail end treatment, type I; guardrail transition, type TGS-1; fence; reinforced concrete bridge approach, 10IN; mulched seeding, type R; Concrete, A, substructure; concrete, c, superstructure.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Work consists of: construction engineering; clearing right-of-way; present structure, remove, structure no; sign, remove; excavation, common; borrow; stormwater management budget; stormwater management implementation; excavation, foundation, unclassified; subgrade treatment, type II; subgrade treatment, type IC; aggregate for end bent backfill; structure backfill, type 2; geotextile for pavement, type 2B; compacted aggregate, no. 53; QC/QA-HMA, 2, 58s, surface, 9.5 mm; guardrail terminal system, w-beam, curved, type 2; guardrail end treatment, type I; guardrail transition, type TGS-1; fence; reinforced concrete bridge approach, 10IN; mulched seeding, type R; Concrete, A, substructure; concrete, c, superstructure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →