Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of: construction engineering; clearing right-of-way; present structure, remove, structure no; sign, remove; excavation, common; borrow; stormwater management budget; stormwater management implementation; excavation, foundation, unclassified; subgrade treatment, type II; subgrade treatment, type IC; aggregate for end bent backfill; structure backfill, type 2; geotextile for pavement, type 2B; compacted aggregate, no. 53; QC/QA-HMA, 2, 58s, surface, 9.5 mm; guardrail terminal system, w-beam, curved, type 2; guardrail end treatment, type I; guardrail transition, type TGS-1; fence; reinforced concrete bridge approach, 10IN; mulched seeding, type R; Concrete, A, substructure; concrete, c, superstructure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pavement removal, 213 SY; paved side ditch, remove, 337 lf; present structure, remove portions, 1 ls; excavation, common, 400 CY; borrow, 80 CY; stormwater management budget, 21000 dol; stormwater management implementation, 1 ls; excavation, foundation, unclassified, 22 CY; subgrade treatment, type II, 184 SY; subgrade treatment, type IC, 1098 SY; aggregate for end bent backfill, 22 CY; structure backfill, type 2, 57 CY; geotextile for pavement, type 2B, 374 SY; compacted aggregate, no. 2, 245 CY; compacted aggregate, no.53, 144 CY; compacted aggregate, no.53, 47 TN; asphalt for tack coat, 1 TN; 404 LF, guardrail, remove; 50 LF, guardrail, MGS w-beam, 6 ft 3IN spacing; 512 SY, sodding.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Pavement removal, 213 SY; paved side ditch, remove, 337 lf; present structure, remove portions, 1 ls; excavation, common, 400 CY; borrow, 80 CY; stormwater management budget, 21000 dol; stormwater management implementation, 1 ls; excavation, foundation, unclassified, 22 CY; subgrade treatment, type II, 184 SY; subgrade treatment, type IC, 1098 SY; aggregate for end bent backfill, 22 CY; structure backfill, type 2, 57 CY; geotextile for pavement, type 2B, 374 SY; compacted aggregate, no. 2, 245 CY; compacted aggregate, no.53, 144 CY; compacted aggregate, no.53, 47 TN; asphalt for tack coat, 1 TN; 404 LF, guardrail, remove; 50 LF, guardrail, MGS w-beam, 6 ft 3IN spacing; 512 SY, sodding.
AvailableBridge reconstruction including replacement with 36" prestressed concrete i-beams, cip abutments and approach work.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Bridge reconstruction including replacement with 36" prestressed concrete i-beams, cip abutments and approach work.
AvailableBridge reconstruction including replacement with 21" prestressed concrete box beams and approach work.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Bridge reconstruction including replacement with 21" prestressed concrete box beams and approach work.
AvailableBridge replacement 20-00233 prestressed concrete box beam
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Bridge replacement 20-00233 prestressed concrete box beam
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis