Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pavement removal, 213 SY; paved side ditch, remove, 337 lf; present structure, remove portions, 1 ls; excavation, common, 400 CY; borrow, 80 CY; stormwater management budget, 21000 dol; stormwater management implementation, 1 ls; excavation, foundation, unclassified, 22 CY; subgrade treatment, type II, 184 SY; subgrade treatment, type IC, 1098 SY; aggregate for end bent backfill, 22 CY; structure backfill, type 2, 57 CY; geotextile for pavement, type 2B, 374 SY; compacted aggregate, no. 2, 245 CY; compacted aggregate, no.53, 144 CY; compacted aggregate, no.53, 47 TN; asphalt for tack coat, 1 TN; 404 LF, guardrail, remove; 50 LF, guardrail, MGS w-beam, 6 ft 3IN spacing; 512 SY, sodding.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of: construction engineering; clearing right-of-way; present structure, remove, structure no; sign, remove; excavation, common; borrow; stormwater management budget; stormwater management implementation; excavation, foundation, unclassified; subgrade treatment, type II; subgrade treatment, type IC; aggregate for end bent backfill; structure backfill, type 2; geotextile for pavement, type 2B; compacted aggregate, no. 53; QC/QA-HMA, 2, 58s, surface, 9.5 mm; guardrail terminal system, w-beam, curved, type 2; guardrail end treatment, type I; guardrail transition, type TGS-1; fence; reinforced concrete bridge approach, 10IN; mulched seeding, type R; Concrete, A, substructure; concrete, c, superstructure.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Work consists of: construction engineering; clearing right-of-way; present structure, remove, structure no; sign, remove; excavation, common; borrow; stormwater management budget; stormwater management implementation; excavation, foundation, unclassified; subgrade treatment, type II; subgrade treatment, type IC; aggregate for end bent backfill; structure backfill, type 2; geotextile for pavement, type 2B; compacted aggregate, no. 53; QC/QA-HMA, 2, 58s, surface, 9.5 mm; guardrail terminal system, w-beam, curved, type 2; guardrail end treatment, type I; guardrail transition, type TGS-1; fence; reinforced concrete bridge approach, 10IN; mulched seeding, type R; Concrete, A, substructure; concrete, c, superstructure.
AvailableBridge deck overlay 048-28-06244 prestressed concrete box beam.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Bridge deck overlay 048-28-06244 prestressed concrete box beam.
AvailableBridge reconstruction including replacement with 36" prestressed concrete i-beams, cip abutments and approach work.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Bridge reconstruction including replacement with 36" prestressed concrete i-beams, cip abutments and approach work.
AvailableBridge reconstruction including replacement with 21" prestressed concrete box beams and approach work.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Bridge reconstruction including replacement with 21" prestressed concrete box beams and approach work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis