Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge reconstruction including replacement with 36" prestressed concrete i-beams, cip abutments and approach work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bridge reconstruction including replacement with 21" prestressed concrete box beams and approach work.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Bridge reconstruction including replacement with 21" prestressed concrete box beams and approach work.
AvailableWork include 616' guardrail, rem; 800 CY excavation, eart; 50 CY subgrade undercutting, type ii; 900' erosion control, silt fence; 1,650 SY aggregate base, 8"; 1,358 SY hma surface, rem; 106' curb and gutter, bridge approach, det 5; 26 EA guardrail reflector; 413 SF sign, type b, temp, prismatic, oper; 1,700 CY excavation, fdn; 793' pile, steel, furn and driven, 14 inch; 165 CY bridge ltg, oper and maintain; 329 CY substructure conc; 584' prest conc bulb-tee beam, furn, 36 inch by 49 inch; 80 SF joint waterproofing; 2,500 SF silane treatment; 200' bridge railing, aesthetic parapet tube, det 2.
Posted Date
Dec 11, 2025
Due Date
Jan 9, 2026
Release: Dec 11, 2025
Close: Jan 9, 2026
Work include 616' guardrail, rem; 800 CY excavation, eart; 50 CY subgrade undercutting, type ii; 900' erosion control, silt fence; 1,650 SY aggregate base, 8"; 1,358 SY hma surface, rem; 106' curb and gutter, bridge approach, det 5; 26 EA guardrail reflector; 413 SF sign, type b, temp, prismatic, oper; 1,700 CY excavation, fdn; 793' pile, steel, furn and driven, 14 inch; 165 CY bridge ltg, oper and maintain; 329 CY substructure conc; 584' prest conc bulb-tee beam, furn, 36 inch by 49 inch; 80 SF joint waterproofing; 2,500 SF silane treatment; 200' bridge railing, aesthetic parapet tube, det 2.
AvailableBridge reconstruction including removal and replacement and approach work.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Bridge reconstruction including removal and replacement and approach work.
AvailableWork consists of: construction engineering; clearing right-of-way; present structure, remove, structure no; sign, remove; excavation, common; borrow; stormwater management budget; stormwater management implementation; excavation, foundation, unclassified; subgrade treatment, type II; subgrade treatment, type IC; aggregate for end bent backfill; structure backfill, type 2; geotextile for pavement, type 2B; compacted aggregate, no. 53; QC/QA-HMA, 2, 58s, surface, 9.5 mm; guardrail terminal system, w-beam, curved, type 2; guardrail end treatment, type I; guardrail transition, type TGS-1; fence; reinforced concrete bridge approach, 10IN; mulched seeding, type R; Concrete, A, substructure; concrete, c, superstructure.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Work consists of: construction engineering; clearing right-of-way; present structure, remove, structure no; sign, remove; excavation, common; borrow; stormwater management budget; stormwater management implementation; excavation, foundation, unclassified; subgrade treatment, type II; subgrade treatment, type IC; aggregate for end bent backfill; structure backfill, type 2; geotextile for pavement, type 2B; compacted aggregate, no. 53; QC/QA-HMA, 2, 58s, surface, 9.5 mm; guardrail terminal system, w-beam, curved, type 2; guardrail end treatment, type I; guardrail transition, type TGS-1; fence; reinforced concrete bridge approach, 10IN; mulched seeding, type R; Concrete, A, substructure; concrete, c, superstructure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis