Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include 616' guardrail, rem; 800 CY excavation, eart; 50 CY subgrade undercutting, type ii; 900' erosion control, silt fence; 1,650 SY aggregate base, 8"; 1,358 SY hma surface, rem; 106' curb and gutter, bridge approach, det 5; 26 EA guardrail reflector; 413 SF sign, type b, temp, prismatic, oper; 1,700 CY excavation, fdn; 793' pile, steel, furn and driven, 14 inch; 165 CY bridge ltg, oper and maintain; 329 CY substructure conc; 584' prest conc bulb-tee beam, furn, 36 inch by 49 inch; 80 SF joint waterproofing; 2,500 SF silane treatment; 200' bridge railing, aesthetic parapet tube, det 2.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes (780-ft) bridge superstructure (s. N. 016-0098) replacement including approach slab replacement, pier repairs, lighting, ada improvements, traffic signal modernization, pedestrian walkways, bike lanes, curb ramp, and curb and gutter replacement. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
Work includes (780-ft) bridge superstructure (s. N. 016-0098) replacement including approach slab replacement, pier repairs, lighting, ada improvements, traffic signal modernization, pedestrian walkways, bike lanes, curb ramp, and curb and gutter replacement. See outside link.
AvailableWork includes (780-ft) bridge superstructure (s. N. 016-0098) replacement including approach slab replacement, pier repairs, lighting, ada improvements, traffic signal modernization, pedestrian walkways, bike lanes, curb ramp, and curb and gutter replacement. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
Work includes (780-ft) bridge superstructure (s. N. 016-0098) replacement including approach slab replacement, pier repairs, lighting, ada improvements, traffic signal modernization, pedestrian walkways, bike lanes, curb ramp, and curb and gutter replacement. See outside link.
Available(740-Ft) Bridge Superstructure reconstruction, approach slab reconstruction, bridge railing, fencing, earth excavation, topsoil excavation and placement, seeding and sodding, storm sewer and drainage structures, erosion control, hot-mix asphalt base, binder, and surface courses, PCC driveway pavement, PCC sidewalk, combination curb and gutter, traffic signal modernization, roadway and underpass lighting. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
(740-Ft) Bridge Superstructure reconstruction, approach slab reconstruction, bridge railing, fencing, earth excavation, topsoil excavation and placement, seeding and sodding, storm sewer and drainage structures, erosion control, hot-mix asphalt base, binder, and surface courses, PCC driveway pavement, PCC sidewalk, combination curb and gutter, traffic signal modernization, roadway and underpass lighting. See outside link.
(740-Ft) Bridge Superstructure reconstruction, approach slab reconstruction, bridge railing, fencing, earth excavation, topsoil excavation and placement, seeding and sodding, storm sewer and drainage structures, erosion control, hot-mix asphalt base, binder, and surface courses, PCC driveway pavement, PCC sidewalk, combination curb and gutter, traffic signal modernization, roadway and underpass lighting. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
(740-Ft) Bridge Superstructure reconstruction, approach slab reconstruction, bridge railing, fencing, earth excavation, topsoil excavation and placement, seeding and sodding, storm sewer and drainage structures, erosion control, hot-mix asphalt base, binder, and surface courses, PCC driveway pavement, PCC sidewalk, combination curb and gutter, traffic signal modernization, roadway and underpass lighting. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis