Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge reconstruction including replacement with 21" prestressed concrete box beams and approach work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bridge reconstruction including replacement with 36" prestressed concrete i-beams, cip abutments and approach work.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Bridge reconstruction including replacement with 36" prestressed concrete i-beams, cip abutments and approach work.
AvailableWork include 616' guardrail, rem; 800 CY excavation, eart; 50 CY subgrade undercutting, type ii; 900' erosion control, silt fence; 1,650 SY aggregate base, 8"; 1,358 SY hma surface, rem; 106' curb and gutter, bridge approach, det 5; 26 EA guardrail reflector; 413 SF sign, type b, temp, prismatic, oper; 1,700 CY excavation, fdn; 793' pile, steel, furn and driven, 14 inch; 165 CY bridge ltg, oper and maintain; 329 CY substructure conc; 584' prest conc bulb-tee beam, furn, 36 inch by 49 inch; 80 SF joint waterproofing; 2,500 SF silane treatment; 200' bridge railing, aesthetic parapet tube, det 2.
Posted Date
Dec 11, 2025
Due Date
Jan 9, 2026
Release: Dec 11, 2025
Close: Jan 9, 2026
Work include 616' guardrail, rem; 800 CY excavation, eart; 50 CY subgrade undercutting, type ii; 900' erosion control, silt fence; 1,650 SY aggregate base, 8"; 1,358 SY hma surface, rem; 106' curb and gutter, bridge approach, det 5; 26 EA guardrail reflector; 413 SF sign, type b, temp, prismatic, oper; 1,700 CY excavation, fdn; 793' pile, steel, furn and driven, 14 inch; 165 CY bridge ltg, oper and maintain; 329 CY substructure conc; 584' prest conc bulb-tee beam, furn, 36 inch by 49 inch; 80 SF joint waterproofing; 2,500 SF silane treatment; 200' bridge railing, aesthetic parapet tube, det 2.
AvailableBridge reconstruction including removal and replacement and approach work.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Bridge reconstruction including removal and replacement and approach work.
AvailableThe objective of this research is to evaluate the requirements for Service III limit state regarding design and load rating for tension in prestressed concrete bridge superstructure members to ensure consistency and reliability, while maintaining operational flexibility.
Posted Date
Nov 6, 2025
Due Date
Jan 12, 2026
Release: Nov 6, 2025
Close: Jan 12, 2026
The objective of this research is to evaluate the requirements for Service III limit state regarding design and load rating for tension in prestressed concrete bridge superstructure members to ensure consistency and reliability, while maintaining operational flexibility.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis