Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of the replacement of 10" cast iron force main (sf-006) with 2,465 LF of 8" pvc force man from hrsd north shore road pump station #117 to the proposed connection point with sf-004 and sf-005 and the replacement of 12" cast iron force main (sf-006).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of the replacement of 10" cast iron force main (sf-006) with 2,465 LF of 8" pvc force man from hrsd north shore road pump station #117 to the proposed connection point with sf-004 and sf-005 and the replacement of 12" cast iron force main (sf-006).
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Work consists of the replacement of 10" cast iron force main (sf-006) with 2,465 LF of 8" pvc force man from hrsd north shore road pump station #117 to the proposed connection point with sf-004 and sf-005 and the replacement of 12" cast iron force main (sf-006).
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide force main replacement services. Replacing approx. 4,770 LF of existing 16" force main, provide all necessary bypass pumping, MOT, restoration of disturbed areas, and pavement repair.
Posted Date
Dec 29, 2025
Due Date
Feb 2, 2026
Release: Dec 29, 2025
Close: Feb 2, 2026
Provide force main replacement services. Replacing approx. 4,770 LF of existing 16" force main, provide all necessary bypass pumping, MOT, restoration of disturbed areas, and pavement repair.
AvailableWork includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Posted Date
Nov 23, 2025
Due Date
Jan 21, 2026
Release: Nov 23, 2025
Close: Jan 21, 2026
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
AvailableProject consists of constructing a replacement gunning sanitary sewer pump station and appurtenances, 8" and 12" gravity sewer lines and appurtenances, 8-inch force main including horizontal directional drilling (hdd) crossing of beech fork, and 20" and 16" water main installation including hdd.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
Project consists of constructing a replacement gunning sanitary sewer pump station and appurtenances, 8" and 12" gravity sewer lines and appurtenances, 8-inch force main including horizontal directional drilling (hdd) crossing of beech fork, and 20" and 16" water main installation including hdd.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →