Special DistrictWA
Posted
Aug 26, 2026
Sep 24, 2026
Seattle-Tacoma International Airport South Concourse Evolution (SCE), Bid Package 3
Bid Package 3 includes: Subsystem 3.01 - Phase 1 glass and aluminum systems, Subsystem 3.02 - Phase 1 and select Phase 2 vertical transportation, Subsystem 3.03 - Phase 1 demolition and install of passenger loading bridges (PLBs), Subsystem 3.04 - Main electrical rooms masonry, Subsystem 3.05 - Main electrical rooms drywall, Subsystem 3.06 - Main electrical rooms doors, frames, and hardware, Subsystem 3.07 - Main electrical rooms misc metals, Subsystem 3.08 - Main electrical rooms firestopping, Subsystem 3.09 - Main electrical rooms joint sealants, Subsystem 3.10 - Main electrical rooms paint and epoxy flooring.