Gum Tree & Knoll Park Pipeline Replacement Project
Work includes approx 3,800 LF of 8" cmlc; 2,100 LF of 6" cmlc; 3,000 LF of 20" cmlc.
Description: Southwest Irrigation District is soliciting sealed bids for the Seale Injection Pipeline Project, with bids due by 5:00 p.m. local time on September 21, 2026, and publicly read at the district board meeting on September 23, 2026. The project includes constructing a pump station on the Burley Irrigation District J Canal with two pumps serving the South Well and East Well recharge sites through a 22-CFS pipeline approximately 6,500 feet long. Licensed and insured irrigation-pipeline contractors may request the bidding documents by email from the district representative.
SpecialDistrict · ID, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Fallbrook Public Utility District
Special DistrictCA
Posted
-
Oct 7, 2026
Work includes approx 3,800 LF of 8" cmlc; 2,100 LF of 6" cmlc; 3,000 LF of 20" cmlc.
Eastern New Mexico Water Utility Authority
Special DistrictNM
Posted
Jul 1, 2026
Oct 14, 2026
Project includes approx. 75,243 LF of 42" Welded steel pipe production; 83, 941 LF of 42" Welded steel pipe installation; 79,189 LF of Fiber optic conduit and handholes.
CityCO
Posted
Aug 25, 2026
Sep 24, 2026
Seeking statements of qualifications from experienced pipeline rehabilitation contractors. This is the first step of a two-step procurement. No construction contract will be awarded through this prequalification solicitation. Following completion of the prequalification process, the City anticipates issuing competitive bid documents to the contractors selected as prequalified. The anticipated work may include Pipeline cleaning, inspection, and condition assessment. Rehabilitation using HDPE lining, cured-in-place pipe lining, pipe bursting, conventional removal and replacement, or other appropriate methods. Installation or replacement of fittings, valves, air-release valves, service connections, and other pipeline appurtenances. Pipeline testing, commissioning, site restoration, and coordination of access and shutdowns.
CityCO
Posted
Jun 10, 2026
Sep 21, 2026
Seeks the qualifications of respondents to provide progressive design-build services for a project involving approximately 32,000 feet of force main and gravity sanitary sewer and an approximately 6 million gallons per day lift station to divert wastewater flows.