Rogers County Rural Water District 3
Special DistrictOK
Aug 4, 2026
Closes
Sep 3, 2026
Keetonville Pump Station Project RFP
Work consisting of a CMU building, pumps, piping, and site work with associated appurtenances.
Description: Pump station rehabilitation project.
County · OH, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Rogers County Rural Water District 3
Special DistrictOK
Aug 4, 2026
Closes
Sep 3, 2026
Work consisting of a CMU building, pumps, piping, and site work with associated appurtenances.
Brookfield Water Pollution Control Authority
Special DistrictCT
Jul 29, 2026
Closes
Sep 11, 2026
The 777 Pump Station Improvement Project involves installing a turnkey packaged pump station with a valve pit and associated appurtenances. The work includes removing the existing wet well, valve pit, propane tank, and generator; providing dewatering and a temporary sewer bypass; installing a diesel generator; and retrofitting an existing manhole inlet with a grinder. The solicitation seeks construction expertise covering pump-station installation, sewer bypass, and related electrical and mechanical systems.
CityOR
Aug 11, 2026
Closes
Sep 2, 2026
Project consists of rehabilitation of the existing NE Pump Station wet well, including replacement of pump guiderails, discharge piping and fittings, surface preparation of the interior wet well and valve vault concrete and patching / surface repair of the interior wet well and valve vault concrete. Associated work includes installation of a temporary bypass valve, temporary bypass pumping, testing, and restoration.
CityFL
Jul 20, 2026
Closes
Aug 25, 2026
The City of Plantation is soliciting bids for the rehabilitation of Lift Station No. 73. The work includes demolishing the existing drywell and equipment, converting the wet well to a manhole, and installing new pumps, piping, valves, and electrical equipment, along with related tree removal and demolition. The solicitation opened July 20, 2026, requires a mandatory pre-bid meeting and site visit on August 12, 2026, and closes August 25, 2026.
Procurement and program contacts connected to Marion County.