Clay Street Driveway Replacement Project
Project includes forming and pouring replacement of an existing concrete driveway and associated sidewalks with the City doing removal and fill to change the grades.
Description: Work includes approx. 48 LF of structural shoring, 10 CY of controlled density fill, 255 TON of crushed surfacing, 11 TON of commercial HMA, 3 TON of cold mix asphalt for temporary patching, 60 CY of removal and replacement of unsuitable material, 1 EA connection to existing side sewer stub, 1 EA connection to existing building sewer, 65 LF of 4" PVC sanitary sewer side service pipe, 2 EA connections to existing irrigation pipe, 310 LF of 60" SPPE irrigation pipe, 800 SY of Type C topsoil, 69 LF of cement concrete traffic curb and gutter, 23 SY of Type 1 cement concrete driveway entrance, 30 LF of Type 4 chain link fence, and 16 SY of cement concrete sidewalk.
SpecialDistrict · WA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Wenatchee Reclamation District.
These related opportunities are still open for bidding.
CityMI
Posted
Aug 28, 2026
Sep 8, 2026
Project includes forming and pouring replacement of an existing concrete driveway and associated sidewalks with the City doing removal and fill to change the grades.
CityIA
Posted
Aug 25, 2026
Sep 8, 2026
Storm sewer replacement project. Scope of work includes - 350 LF 12" filter sock; 2 EA intake protection device; 70 LF horizontal saw cut; 242 LF horizontal saw cut; 242 SY pavement, driveway and sidewalk removal; 32 Units clearing and grubbing; 639 CY excavation, class 10, ditch grading (borrow); see outside link.
Hollidaysburg Borough Authority
Special DistrictPA
Posted
Aug 11, 2026
Sep 10, 2026
Work includes replacement of approx 1,700 LF of 8", 6" and 4" DIP water main, service lines and all necessary appurtenances.
CityCO
Posted
Aug 31, 2026
Sep 29, 2026
Street improvements project includes clearing and grubbing (1 ls), removal of gutter (114 lf), removal of curb and gutter (264 lf), removal of concrete pavement (610 sy), removal of asphalt mat (4,319 sy), unclassified excavation (complete in place) (868 cy), unsuitable material (6,498 cy), embankment material (complete in place) (1,839 cy), stripping (gravel road surfacing) (2,166 cy), see attached bid ad.