School Street and Easy Street Pipe Replacement Project
Aug 12, 2026
Closes
Sep 2, 2026
Work includes approx. 48 LF of structural shoring, 10 CY of controlled density fill, 255 TON of crushed surfacing, 11 TON of commercial HMA, 3 TON of cold mix asphalt for temporary patching, 60 CY of removal and replacement of unsuitable material, 1 EA connection to existing side sewer stub, 1 EA connection to existing building sewer, 65 LF of 4" PVC sanitary sewer side service pipe, 2 EA connections to existing irrigation pipe, 310 LF of 60" SPPE irrigation pipe, 800 SY of Type C topsoil, 69 LF of cement concrete traffic curb and gutter, 23 SY of Type 1 cement concrete driveway entrance, 30 LF of Type 4 chain link fence, and 16 SY of cement concrete sidewalk.