Closing soon

S-I15-1(143)17 - I-15; SB Passing Lane MP 15.0 to 20.3 - New Capacity RFP

Description: Work includes 1 LS of mobilization; 3 EA of reconstruct manhole - raise; 97,822 SY of geogrid; 1 EA of remove catch basin; 8 EA of remove tree; 2 EA of remove concrete headwall 61" - 84" pipe; 6,974 FT of remove guardrail; 86 ft of remove fence; 20 EA of remove pipe end section; 3,192 FT of remove precast concrete barrier; 174,077 CY of roadway excavation; 1,726 CY of loose riprap; 4 CY of compacted riprap; 3,571 SY of turf reinforcement mat; 300 ft of drainage pipe - 24", metal, silt-tight; 3 EA of circular end section 18"; 1 EA of 4 FT standard manhole 11 ft to 13 ft deep - cb 11; 50,936 CY of untreated base course; 51,577 TN of hmhma - 1/2"; 110 cy of asphalt pavement soft spot repair - contingency item; etc, see attached file.

Buyer
Released
-
Closes
Aug 25, 2026(13 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts