Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a new water supply well, well building, site work, electrical, and installation of approximately 8350 linear feet of 12" potable water main, 2560 linear feet of 20" raw water main, and 8270 linear feet of 6" sanitary sewer force main with related appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The construction of a new water supply well; including well building, site work, electrical, along with approx. 8,350 LF of 12" potable water main, 2,560 LF of 20" raw water main, approx. 8270 LF of 6" sanitary sewer force main and related appurtenances.
Posted Date
Oct 15, 2025
Due Date
Feb 19, 2026
Release: Oct 15, 2025
Close: Feb 19, 2026
The construction of a new water supply well; including well building, site work, electrical, along with approx. 8,350 LF of 12" potable water main, 2,560 LF of 20" raw water main, approx. 8270 LF of 6" sanitary sewer force main and related appurtenances.
AvailableProject consists of construction of Public Water Supply Well No. 5, and the Well No. 5 Pumphouse, completion of SCADA system updates, abandonment of Well No. 2, and demolition of the Well No. 2 Pumphouse. Contract A - Public Water Supply Well No. 5: Construction of a 1,200 gallon per minute (gpm) municipal well to a depth of 106 feet, well development, performance pump testing of constructed well, WDNR NR 809 water quality analysis, erosion control restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. Contract B - Well No. 5 Pumphouse, SCADA Updates & Demolition of Well No. 2 Pumphouse: Construction of the Well No. 5 Pumphouse building, including furnishing and installing all well pump equipment, piping, valves, accessories and controls. The building includes a pump room, chemical room, and restroom. The Well No. 5 Pumphouse contract also includes installation of a natural gas-powered emergency electrical generator, erosion control measures, site work, site piping, driveway, pavement, restoration of the work area, pump testing, water quality testing, and other miscellaneous items in conformance with the Contract Documents. Also, to include demolition of the Well No. 2 Pumphouse including building demolition, excavation, water main and other utilities disconnections/abandonments, backfilling, grading, and site restoration. The existing Well No. 2 motor control center and well pump equipment are to be salvaged and reused in the proposed Well No. 5 Pumphouse. Well No. 2 is to be abandoned including removal and off-site disposal, or salvaging for the Owner, of existing well pump, column pipe, electrical cables, and motor, removing the casing to 3 feet below final finish grade, filling with concrete, neat cement grout or approved bentonite chips, and submitting a Well/Drillhole Abandonment Report. In addition, the project includes SCADA system updates which include removal and disposal of existing SCADA system equipment and installation of new equipment at the existing Well Nos. 1, 3, & 4, pumphouses, reservoirs site, and the proposed Well No. 5 Pumphouse.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
Project consists of construction of Public Water Supply Well No. 5, and the Well No. 5 Pumphouse, completion of SCADA system updates, abandonment of Well No. 2, and demolition of the Well No. 2 Pumphouse. Contract A - Public Water Supply Well No. 5: Construction of a 1,200 gallon per minute (gpm) municipal well to a depth of 106 feet, well development, performance pump testing of constructed well, WDNR NR 809 water quality analysis, erosion control restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. Contract B - Well No. 5 Pumphouse, SCADA Updates & Demolition of Well No. 2 Pumphouse: Construction of the Well No. 5 Pumphouse building, including furnishing and installing all well pump equipment, piping, valves, accessories and controls. The building includes a pump room, chemical room, and restroom. The Well No. 5 Pumphouse contract also includes installation of a natural gas-powered emergency electrical generator, erosion control measures, site work, site piping, driveway, pavement, restoration of the work area, pump testing, water quality testing, and other miscellaneous items in conformance with the Contract Documents. Also, to include demolition of the Well No. 2 Pumphouse including building demolition, excavation, water main and other utilities disconnections/abandonments, backfilling, grading, and site restoration. The existing Well No. 2 motor control center and well pump equipment are to be salvaged and reused in the proposed Well No. 5 Pumphouse. Well No. 2 is to be abandoned including removal and off-site disposal, or salvaging for the Owner, of existing well pump, column pipe, electrical cables, and motor, removing the casing to 3 feet below final finish grade, filling with concrete, neat cement grout or approved bentonite chips, and submitting a Well/Drillhole Abandonment Report. In addition, the project includes SCADA system updates which include removal and disposal of existing SCADA system equipment and installation of new equipment at the existing Well Nos. 1, 3, & 4, pumphouses, reservoirs site, and the proposed Well No. 5 Pumphouse.
AvailableThis RFP is for the installation of Brightleaf Boulevard and Narrows Road Sidewalk Improvements-Phase 2.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
This RFP is for the installation of Brightleaf Boulevard and Narrows Road Sidewalk Improvements-Phase 2.
AvailableThe work includes; construction of two (2) 5" dia test-observation wells, construction and aquifer testing of a type i community water supply well known as test-production well no. 8.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
The work includes; construction of two (2) 5" dia test-observation wells, construction and aquifer testing of a type i community water supply well known as test-production well no. 8.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →