Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction services related to roof replacements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide microbial inspections of residence halls and monthly remediation.
Posted Date
Jan 12, 2026
Due Date
Feb 6, 2026
Release: Jan 12, 2026
Close: Feb 6, 2026
Provide microbial inspections of residence halls and monthly remediation.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work includes full roof replacement of the existing EPDM roof system with new a EPDM roof system, hazardous material removals, associated mechanical, electrical and plumbing work, exterior temporary stairs/scaffolding systems as required, site restoration.
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
The scope of work includes full roof replacement of the existing EPDM roof system with new a EPDM roof system, hazardous material removals, associated mechanical, electrical and plumbing work, exterior temporary stairs/scaffolding systems as required, site restoration.
AvailableInterior renovation including interior finishes throughout. Interior work includes finish carpentry, doors and frames, gypsum wallboard assemblies, plaster repairs, ceramic tiling, acoustical panel ceilings, resilient flooring, carpeting, interior painting, building specialties, and countertops. Exterior work includes masonry cleaning, partial roof replacement, sheet metal flashing and trim, wood trim replacement, replacement of main entry doors, window replacement, and exterior painting. Site improvements directly adjacent to each hall, to provide accessible routes to each building. Renovations to MEP and FP systems.
Posted Date
Jan 4, 2026
Due Date
Feb 3, 2026
Release: Jan 4, 2026
Close: Feb 3, 2026
Interior renovation including interior finishes throughout. Interior work includes finish carpentry, doors and frames, gypsum wallboard assemblies, plaster repairs, ceramic tiling, acoustical panel ceilings, resilient flooring, carpeting, interior painting, building specialties, and countertops. Exterior work includes masonry cleaning, partial roof replacement, sheet metal flashing and trim, wood trim replacement, replacement of main entry doors, window replacement, and exterior painting. Site improvements directly adjacent to each hall, to provide accessible routes to each building. Renovations to MEP and FP systems.
AvailableWork includes roof replacement of the south of broad operations building. The building is a premanufactured metal building consisting of 8,500 SF with 5,500 SF for office space and 3,500 SF for warehouse. The building construction was finalized in 2019, and since that time there has been corrosion of roof panels and fasteners due to dissimilar metal corrosion.
Posted Date
Jan 8, 2026
Due Date
Feb 12, 2026
Release: Jan 8, 2026
Close: Feb 12, 2026
Work includes roof replacement of the south of broad operations building. The building is a premanufactured metal building consisting of 8,500 SF with 5,500 SF for office space and 3,500 SF for warehouse. The building construction was finalized in 2019, and since that time there has been corrosion of roof panels and fasteners due to dissimilar metal corrosion.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →