Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across New York Dormitory Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Director, Budget & Operations
Human Resources Manager I, Organizational Ombuds
Director, Public Finance
Senior Director, External Relations
Premium
Access the largest public sector contact database
Active opportunities open for bidding
New York Dormitory Authority
The configuration requires the boilers to operate year-round. Remove and properly dispose of the existing shell-and-tube water heater. Furnish and install electric water heaters and a holding tank to provide the building with adequate domestic hot water.
Posted Date
Jan 20, 2026
Due Date
Mar 4, 2026
Release: Jan 20, 2026
New York Dormitory Authority
Close: Mar 4, 2026
The configuration requires the boilers to operate year-round. Remove and properly dispose of the existing shell-and-tube water heater. Furnish and install electric water heaters and a holding tank to provide the building with adequate domestic hot water.
AvailableNew York Dormitory Authority
Scope of work includes repairs to the unsafe, and SWARMP conditions identified in the FISP report filed including misaligned and/or loose wall panel system, cracked glass panel, deteriorated sealant joint, deteriorated mortar joint, cracked and/or spalled brick masonry, cracked and/or spalled stone masonry, cracked or spalled concrete and loose gasket. Installer Qualifications pertaining to waterproofing are stipulated in the Contract Documents.
Posted Date
Dec 29, 2025
Due Date
Feb 11, 2026
Release: Dec 29, 2025
New York Dormitory Authority
Close: Feb 11, 2026
Scope of work includes repairs to the unsafe, and SWARMP conditions identified in the FISP report filed including misaligned and/or loose wall panel system, cracked glass panel, deteriorated sealant joint, deteriorated mortar joint, cracked and/or spalled brick masonry, cracked and/or spalled stone masonry, cracked or spalled concrete and loose gasket. Installer Qualifications pertaining to waterproofing are stipulated in the Contract Documents.
AvailableNew York Dormitory Authority
Modification of existing elevators at brooklyn children pc buildings 1 and 2.
Posted Date
Jan 20, 2026
Due Date
Mar 3, 2026
Release: Jan 20, 2026
New York Dormitory Authority
Close: Mar 3, 2026
Modification of existing elevators at brooklyn children pc buildings 1 and 2.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
New York Dormitory Authority
This document outlines the detailed specifications and administrative requirements for the John Jay College Haaren Hall Gymnasium Facilities Upgrade project (DASNY Project No. 384400). It covers general requirements, demolition, various construction divisions (metals, thermal protection, openings, finishes, equipment, furnishings, electrical), and closeout procedures, providing a comprehensive guide for contractors involved in the project. The specifications include requirements for product selection, quality assurance, submittal procedures, project management, and adherence to various standards and codes.
Effective Date
Sep 25, 2025
Expires
Effective: Sep 25, 2025
New York Dormitory Authority
Expires:
This document outlines the detailed specifications and administrative requirements for the John Jay College Haaren Hall Gymnasium Facilities Upgrade project (DASNY Project No. 384400). It covers general requirements, demolition, various construction divisions (metals, thermal protection, openings, finishes, equipment, furnishings, electrical), and closeout procedures, providing a comprehensive guide for contractors involved in the project. The specifications include requirements for product selection, quality assurance, submittal procedures, project management, and adherence to various standards and codes.
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.