Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Beaufort-Jasper Water And Sewer Authority
Beaufort-Jasper Water & Sewer Authority (BJWSA) is soliciting bids to install a second polymer feed system at the Chelsea Water Treatment Plant in Okatie, SC. The project includes the installation of a dry polymer system, mix/hold tank, piping, electrical work, and floor drain modifications to be completed within a 60-day term. Bidders must comply with specific SMWBE Good Faith Effort requirements and submit all required affidavits as outlined in the solicitation instructions.
Posted Date
Mar 9, 2026
Due Date
Apr 7, 2026
Release: Mar 9, 2026
Beaufort-Jasper Water And Sewer Authority
Close: Apr 7, 2026
Beaufort-Jasper Water & Sewer Authority (BJWSA) is soliciting bids to install a second polymer feed system at the Chelsea Water Treatment Plant in Okatie, SC. The project includes the installation of a dry polymer system, mix/hold tank, piping, electrical work, and floor drain modifications to be completed within a 60-day term. Bidders must comply with specific SMWBE Good Faith Effort requirements and submit all required affidavits as outlined in the solicitation instructions.
AvailableBeaufort-Jasper Water And Sewer Authority
Provide waste container and hauling services.
Posted Date
Feb 27, 2026
Due Date
Apr 2, 2026
Release: Feb 27, 2026
Beaufort-Jasper Water And Sewer Authority
Close: Apr 2, 2026
Provide waste container and hauling services.
AvailableBeaufort-Jasper Water And Sewer Authority
Work includes approx 280 LF of 4" HDPE Low Pressure Sewer Via Open Cut; 40 LF of 4" PVC Low Pressure Sewer, Via Open Cut; 90 LF of 4" HDPE Low Pressure Sewer Via Horizontal Directional Drill with 8" HDPE Casing Pipe; 1,715 LF of 2" HDPE Low Pressure Sewer Via Trenchless Technologies; 585 LF of 2" HDPE Low Pressure Sewer Via Open Cut; 160 LF of 1.25" HDPE Sewer Lateral from LPS to Lateral Kit, Via Open Cut; Existing Wet Well Epoxy Lining; Gravity Sewer Lateral Connection.
Posted Date
Feb 19, 2026
Due Date
Mar 24, 2026
Release: Feb 19, 2026
Beaufort-Jasper Water And Sewer Authority
Close: Mar 24, 2026
Work includes approx 280 LF of 4" HDPE Low Pressure Sewer Via Open Cut; 40 LF of 4" PVC Low Pressure Sewer, Via Open Cut; 90 LF of 4" HDPE Low Pressure Sewer Via Horizontal Directional Drill with 8" HDPE Casing Pipe; 1,715 LF of 2" HDPE Low Pressure Sewer Via Trenchless Technologies; 585 LF of 2" HDPE Low Pressure Sewer Via Open Cut; 160 LF of 1.25" HDPE Sewer Lateral from LPS to Lateral Kit, Via Open Cut; Existing Wet Well Epoxy Lining; Gravity Sewer Lateral Connection.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Beaufort-Jasper Water And Sewer Authority
The agenda for the Regular Meeting of the Members of the Authority includes standard procedural items such as Call to Order, Invocation and Pledge of Allegiance, and Public Comment periods, which allow for both in-person and electronic submissions. Key discussion segments involve the General Manager's Report and various Committee Reports from the Executive, Capital Projects, Finance, Personnel, Underserved Areas Ad Hoc, and Local Government Ad Hoc committees. The Consent Agenda features the approval of a Purchase Order for a new Sludge Removal System at Purrysburg Water Treatment Plant and a Contract Amendment for sewer and water improvements in the May River and Stoney Creek area. New Business includes a request for a charitable donation from Royal Live Oaks Academy Charter School. Executive Session discussions are scheduled to cover updates on the New River Wastewater Treatment Plant Property Acquisition, Hardeeville Waterline Replacement Project, SALT/SCA Contract, Chelsea South Contract, Service Area Expansion, and the Charitable Giving Policy.
The agenda for this Regular Meeting of the Members of the Authority includes sections for public comment, committee reports from Executive, Capital Projects, Finance, Personnel, Underserved Areas Ad Hoc, and Local Government Ad Hoc committees. The Consent Agenda items focus on financial approvals, specifically a Purchase Order for a new Sludge Removal System at Purrysburg Water Treatment Plant and a Contract Amendment for sewer and water improvements related to the May River and Stoney Creek area. New Business includes a request for a charitable donation from Royal Live Oaks Academy Charter School. An Executive Session is scheduled to discuss legal advice concerning updates on the New River Wastewater Treatment Plant Property Acquisition, Hardeeville Waterline Replacement Project, SALT/SCA Contract, Chelsea South Contract, Service Area Expansion, and the Charitable Giving Policy.
The meeting included a public comment period, a general manager's report, and committee reports from the Executive Committee, Capital Projects Committee, Finance Committee, Personnel Committee, Underserved Areas Ad Hoc Committee, and Local Government Ad Hoc Committee. The consent agenda included the approval of a purchase order for miscellaneous plant equipment. New business included updates on the Water and Sewer Master Plan Project and the PFAS Project, approval of the Stoney Creek Construction Contract and the Alljoy Engineering Contract, and approval of the FY2026 Budget resolutions and the FY2026-FY2028 Capital Program. The board also convened in an executive session to discuss the Procurement Policy, MSA contracts, SALT Update, HHPSD Contract Update, Board Handbook, and GM Evaluation.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Beaufort-Jasper Water And Sewer Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database