CityCA
Posted
Sep 28, 2026
Oct 29, 2026
Robb Field Gateway Path
The City of San Diego seeks a qualified contractor to construct the Robb Field Gateway Path, an ADA-compliant pedestrian walkway and bike-path upgrade in the Robb Field/Mission Bay Park area. Work includes demolition, grading, storm-drain installation, a retaining wall, pedestrian lighting, a drinking fountain, irrigation upgrades, landscaping, and protection of existing utilities and trees. The lump-sum construction contract has a 220-working-day schedule and a mandatory pre-bid meeting on October 7, 2026; bids are due October 29, 2026, at 2:00 p.m.
