North Central Parke Community School Corporation
School DistrictIN
Posted
Aug 25, 2026
Sep 16, 2026
Roof Replacement RFP
Roof Replacement at school.
Description: The Town of Rocanville is seeking bids to replace the end-of-life tin roof at the Noble Construction Arena, a pre-engineered steel building at 406 Ellice Street in Rocanville, Saskatchewan. The work is divided into two phases: priority Phase 1 covers the arena roof, including removal of existing roof tin and insulation and installation of spray foam, white 26-gauge sheets, flashing, eavestroughs and downspouts; Phase 2 covers the lobby roof when funding is available. The official posting lists bids closing at 12:00 PM CST on October 30, 2026, and requires Phase 1 to be completed before September 30, 2027.
City · SK, CA
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
North Central Parke Community School Corporation
School DistrictIN
Posted
Aug 25, 2026
Sep 16, 2026
Roof Replacement at school.
FederalMA
Posted
Aug 25, 2026
Sep 10, 2026
The Contractor shall replace the existing single ply roof system with new EPDM roofing systems. The Contractor shall verify the roofing square footage prior to procurement of any materials. The Contractor shall protect the building, property, and occupants during demolition and construction. The Contractor shall remove and dispose of all roofing materials in accordance with all Local, State, and Federal regulations. The Contractor shall install ½” perimeter edge nailer. The Contractor shall include 192 SF of plywood sheathing repair and provide square foot unit pricing for additional. The Contractor shall include 20 LF of soffit vent repair and provide linear foot unit pricing for additional. See attached file.
California Department of General Services
State AgencyCA
Posted
Aug 28, 2026
Sep 23, 2026
Major components of Project Work consist of replacing roofing systems on five existing buildings. For the single-story, Armistice Chapel, with an approximate 2,100sf of roof area, the work includes removing the existing wood shakes roof system and installing new fire-retardant treated wood shakes, underlayment, new copper flashing, gutters, and downspouts to preserve historic architectural features
Marshall Public School District
School DistrictMI
Posted
Aug 4, 2026
Sep 3, 2026
Furnish and install a Carlisle 60 mil EPDM membrane roof at the elementary school. See attached file.