CityWA
Posted
Sep 8, 2026
Oct 13, 2026
S 48th St Seismic Bridge Retrofit
Provide Seismic Bridge Retrofit.
Description: The RFQ seeks a progressive design-build team to perform preconstruction, design, permitting, construction, commissioning, closeout, and related services for seismic retrofits at 16 occupied K–12 facilities, with an estimated total contract value of about $50 million. Additional work may include HVAC, electrical, lighting, roofing, fire alarms, building controls, windows, and exterior improvements; construction is planned during summer breaks in 2027, 2028, and 2029. Qualified teams must submit Statements of Qualifications electronically through Bonfire by October 30, 2026, at 2:00 p.m. Pacific; a mandatory informational meeting is scheduled for October 9, 2026, at 3:30 p.m. Pacific.
SchoolDistrict · WA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityWA
Posted
Sep 8, 2026
Oct 13, 2026
Provide Seismic Bridge Retrofit.
School DistrictOR
Posted
Sep 25, 2026
Oct 20, 2026
Three Rivers School District requests proposals from experienced Construction Manager|General Contractors (CM|GC) for construction of the North Valley High School Seismic Retrofit Project. The work is comprehensive seismic improvements to the gymnasium, with an estimated maximum allowable construction cost of $1,870,000 funded by a Seismic Rehabilitation Grant. Proposals are due by 2:00 p.m. local time on October 20, 2026, and attendance at the mandatory pre-proposal meeting on October 2, 2026, is required.
Hawaii Department of Transportation
State AgencyHI
Posted
Sep 15, 2026
Oct 29, 2026
Seismic retrofit of the waiale gulch, alae (naalae gulch), and pulehu gulch (pohakuokala) bridges. Improvements include removal of debris from the piers; wrapping the piers with carbon fiber, removal of a portion of the backfill from behind the abutments and backfilling with clsm and tying the abutment to the clsm backfill; replacement of the creep blocks at the bents; pier footing upgrades; installing pavement, pavement markers, and temporary erosion control measures; installing scour countermeasures.
School DistrictOR
Posted
Sep 16, 2026
Oct 13, 2026
Provide general contractor services to seismically rehabilitate Harrisburg High School to provide structural integrity to withstand seismic events.
Decision makers connected to this RFP from Northshore School District 417.