CountyMN
Posted
Aug 22, 2026
Sep 15, 2026
CSAH 153 (Lowry Ave) Phase 2 Reconstruction
Reconstruction of Lowry Avenue. 6,629 CY excavation, common; 1 LS dewatering; 150 SY of 2" mill bit surface; 837 SY of 10" conc pavement; 5 LF of 4" PVC pipe sewer; 281 LF of 12" PVC pipe sewer; 2,363 LF of 12" RC pipe sewer design 3006 cl V; 274 LF of 12" lining sewer pipe; 26 LF watermain encasement; 16,866 SF of 4" conc walk. Approx. 0.74 miles in length. See attached file.