CityIA
Posted
May 14, 2026
Sep 30, 2026
2nd Street SE Vault and Sidewalk Repairs
Work consist of 91 CY of excavation, removal of vault lid and wall, 374 LF of subdrain, 1 EA of 6" water fittings, oversized sleeve coupling, 8 EA of 12" water fittings, oversized sleeve coupling, 26 LF of water service pipe, dip, 4", 33 LF of - water service pipe, dip, 6", 236 SF of rigid foam board insulation, 1 EA of 4" valve, 3 EA of 6" valve, 2 EA of fire hydrant assembly, 1 EA of - valve box adjustment, water main, 2 EA of removal of fire hydrant assembly, 3 ea of removal of valve, 4 EA of manhole adjustment, 171 LF of curb and gutter, variable, match existing. See outside link.
