Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for culvert rehabilitation, drainage repairs, and miscellaneous work on I-87 and I-90 between MP 91.3 and MP 197.4, and I-90 between MP B3.7 and MP B21.5.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Dispose of materials containing invasive species; Remove 42" CMP (20 '), inlet extension, headwall and one section of 48" RCP.nstall concrete collar and 12 LF of new 48" SICPP.Install new galv. end section with cutoff wall.Clean, grade, and shape existing roadside section.Clean and video inspect pipe lines.Cut and remove 36" CMP (8 ft.) plus galvanized metal end section.Install 36" new metal end section.Install stone lined ditch to drain to CIN 09137005. Grade slope to match existing, topsoil and establish turf. See attached files.
Posted Date
Dec 30, 2025
Due Date
Jan 28, 2026
Release: Dec 30, 2025
Close: Jan 28, 2026
Dispose of materials containing invasive species; Remove 42" CMP (20 '), inlet extension, headwall and one section of 48" RCP.nstall concrete collar and 12 LF of new 48" SICPP.Install new galv. end section with cutoff wall.Clean, grade, and shape existing roadside section.Clean and video inspect pipe lines.Cut and remove 36" CMP (8 ft.) plus galvanized metal end section.Install 36" new metal end section.Install stone lined ditch to drain to CIN 09137005. Grade slope to match existing, topsoil and establish turf. See attached files.
AvailableThis RFP is for the rehabilitation of the Prallsville Culvert Pit and miscellaneous components at Prallsville Mills, Delaware & Raritan Canal.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
This RFP is for the rehabilitation of the Prallsville Culvert Pit and miscellaneous components at Prallsville Mills, Delaware & Raritan Canal.
AvailableWork includes drainage rehabilitation, repair, replacement, and miscellaneous maintenance services.
Posted Date
Dec 23, 2025
Due Date
Jan 28, 2026
Release: Dec 23, 2025
Close: Jan 28, 2026
Work includes drainage rehabilitation, repair, replacement, and miscellaneous maintenance services.
AvailableCulvert repairs.
Posted Date
Dec 19, 2025
Due Date
Jan 14, 2026
Release: Dec 19, 2025
Close: Jan 14, 2026
Culvert repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis