Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Georgia Department of Transportation (GDOT) is soliciting bids from prequalified maintenance contractors to perform drainage rehabilitation, repair, replacement, and miscellaneous maintenance services (work location noted on I-95 SB at MP 108.3 in Chatham County). The work includes removal/extension of culverts, slope stabilization, traffic control, and compliance with GDOT specifications and MS4 reporting; performance and payment bonds and E-Verify compliance are required. The solicitation was posted 2025-12-23 and the response deadline is 2026-01-28; it is an active RFQ (not a grant) restricted to prequalified contractors.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes clearing and grubbing of right of way, traffic control, control of erosion and sedimentation, roadway excavation, excavation and backfill minor structures, portland cement concrete pavement, miscellaneous concrete, sawed joints in existing pavement, grout pumping, storm drain pipe, pipe-arch culverts, and side drain pipe, renovating existing pipe, misc drainage structures.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Work includes clearing and grubbing of right of way, traffic control, control of erosion and sedimentation, roadway excavation, excavation and backfill minor structures, portland cement concrete pavement, miscellaneous concrete, sawed joints in existing pavement, grout pumping, storm drain pipe, pipe-arch culverts, and side drain pipe, renovating existing pipe, misc drainage structures.
AvailableThe Georgia Department of Transportation (GDOT) is soliciting bids from contractors prequalified for landscape project services to perform PCC slab replacement work (including removal and installation of concrete slabs, traffic control, cleanup, and compliance with GDOT specifications). Only contractors deemed Qualified through GDOT’s routine maintenance prequalification are eligible to respond. The solicitation is an RFQ/ITB with a period of performance requiring work to start within 30 days after the mandatory prework meeting and be completed within 365 days.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
The Georgia Department of Transportation (GDOT) is soliciting bids from contractors prequalified for landscape project services to perform PCC slab replacement work (including removal and installation of concrete slabs, traffic control, cleanup, and compliance with GDOT specifications). Only contractors deemed Qualified through GDOT’s routine maintenance prequalification are eligible to respond. The solicitation is an RFQ/ITB with a period of performance requiring work to start within 30 days after the mandatory prework meeting and be completed within 365 days.
The Georgia Department of Transportation (GDOT) is soliciting bids from contractors prequalified under its Maintenance Master Services Agreement for pavement preservation and maintenance work along SR 208 in Talbot County, GA, including mill & inlay, crack sealing, thermoplastic striping, raised pavement marker removal/reinstallation, and traffic control in accordance with GDOT specifications. The contract requires prequalified status under the GDOT MSA, compliance with E-Verify, and performance and payment bonds equal to 100% of the award; work must begin within 60 days of the Prework Meeting and be completed within 170 days of that meeting. The solicitation is an RFQ/ITB (agency contract) posted 2025-12-18 and is open with a response deadline of 2026-01-08.
Posted Date
Dec 18, 2025
Due Date
Jan 8, 2026
Release: Dec 18, 2025
Close: Jan 8, 2026
DESIGN/BUILD: 2026 bridge, irrigation, and drainage maintenance/rehabilitation on-call services contract.
Posted Date
Dec 12, 2025
Due Date
Jan 9, 2026
Release: Dec 12, 2025
Close: Jan 9, 2026
DESIGN/BUILD: 2026 bridge, irrigation, and drainage maintenance/rehabilitation on-call services contract.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Georgia Department of Transportation (GDOT) is soliciting bids from contractors prequalified under its Maintenance Master Services Agreement for pavement preservation and maintenance work along SR 208 in Talbot County, GA, including mill & inlay, crack sealing, thermoplastic striping, raised pavement marker removal/reinstallation, and traffic control in accordance with GDOT specifications. The contract requires prequalified status under the GDOT MSA, compliance with E-Verify, and performance and payment bonds equal to 100% of the award; work must begin within 60 days of the Prework Meeting and be completed within 170 days of that meeting. The solicitation is an RFQ/ITB (agency contract) posted 2025-12-18 and is open with a response deadline of 2026-01-08.
Available