The Fox Hollow Regional Park Master Plan Update shall establish a preferred conceptual plan for the approximately 21-acre park site and identify improvements, site organization, grading, phasing, and probable construction costs.
The Consultant shall understand that this project is a Master Plan Update and conceptual planning project. The scope does not include preparation of final construction documents, bidding documents, construction specifications, final engineering plans, final architectural plans, or construction administration services.
The conceptual plans and grading plan shall be developed to a level sufficient to evaluate alternatives, establish a preferred park concept, identify major site and grading requirements, develop preliminary construction costs, and establish a framework for future design phases.
Future construction projects identified through the Master Plan may be separately designed and engineered by the City or by consultants retained by the City. The approach and deliverables anticipated to complete the Master Plan Update by the selected Consultant shall include, but not be limited to, the following tasks listed in the RFP.