CityWI
Posted
-
Dec 17, 2026
Central Library Book Stack Lighting Retrofit — 9885 RFP
The City of Madison is soliciting bids for a public-works retrofit of the Central Library’s book-stack lighting and controls to improve lighting and reduce energy and maintenance costs. Work includes removing and replacing the lighting and controls, integrating Network Lighting Controls (Athena), delegated controls design, permits and inspections, and closeout items such as training, as-built drawings, warranties, and spare parts. Construction must be completed within three months after on-site work begins, and construction closeout is due no later than eight months after the start-work letter.
