CityWI
Posted
Oct 29, 2026
Oct 30, 2026
Material Recovery Facility Process Equipment Demolition and Cleanout RFP
Project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building.
Description: The City of Albuquerque Solid Waste Department seeks qualified entities to build or modernize and operate a state-of-the-art materials recovery facility. The facility will process commingled recyclable materials collected by the City. The processed materials will then be marketed as commodities.
City · NM, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Albuquerque.
Adjacent opportunities open for bidding right now.
CityWI
Posted
Oct 29, 2026
Oct 30, 2026
Project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building.
CityWI
Posted
Oct 29, 2026
Oct 30, 2026
Project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building.
CityNM
Posted
Aug 14, 2026
Oct 29, 2026
Requesting proposals from all interested and qualified entities to build/modernize and operate a state-of-the-art materials recovery facility to process recyclable materials collected commingled by the city (program materials) and then market them as commodities.
CityIA
Posted
Oct 8, 2026
Dec 3, 2026
Replacement of the existing activated sludge southwest wastewater treatment facility (SW WWTF with a higher capacity southwest water resource recovery facility (SW WWTF) with biological nutrient removal. Improvements include existing excess flow return pumping station (structure 08) upgrades; construction of a headworks building with screening and grit removal equipment (structure 10), two oxidation ditches (structure 20), three final clarifiers (structure 30) and UV disinfection (structure 40). The project also includes construction of two aerobic digesters (structure 50), a biosolids building with ras/was pumping and two centrifuges for dewatering (structure 60), a dewatered biosolids storage building (structure 70), an administration building and garage (structure 80), a hauled waste receiving station (structure 87), a vactor truck debris pad (structure 88), electrical power and standby generator, sitework improvements, and miscellaneous associated work. New supervisory controls and data acquisition (SCADA) and security will also be included in the project. Additionally, the project includes minor improvements at the northeast WWTP, including miscellaneous architectural, structural, HVAC, and electrical improvements.