CityMN
Posted
Nov 2, 2026
Dec 3, 2026
RFB-PW-Bush Desoto Sherman LS Rehab Project RFP
Rehabilitation of Robie, Sherman, and Bush & Desoto lift stations. Construction of the new lift station rehabilitations. Install new light pole with base. Replacement of pumps (45 HP each) including guide rails, lifting chain, base elbows, discharge piping, pipe supports, and associated pump wiring. Replacement of all internal pipe and fittings in wet well, including flanged 90 degree elbow. 36 LF sawing bit pavement, full depth; 10 LF conc curb and gutter design B618; clean and televise approx. 1,300 LF of 10" dia forcemain. See attached file.
