Special DistrictNE
Posted
Oct 22, 2026
Nov 10, 2026
Purchase Tubular Structures RFP
Designing, detailing, manufacturing, and delivering steel pole structures.
Description: G230s to simpson ph. 2 for tubular steel structures. This specification covers the design, materials, welding, inspection, protective coatings, drawings and delivery of steel transmission single pole structures. The proposal submitted by the manufacturer shall include field bolts, locknuts, vangs, attachment provisions for arms and/or insulators, anchor bolts, base plates, and other necessary items to make a complete structure.
SpecialDistrict · NC, US
Adjacent opportunities open for bidding right now.
Special DistrictNE
Posted
Oct 22, 2026
Nov 10, 2026
Designing, detailing, manufacturing, and delivering steel pole structures.
North Carolina Department of Transportation
State AgencyNC
Posted
Sep 22, 2026
Nov 17, 2026
Clearing & grubbing acre(s); 3 acr supplementary clearing & grubbing; 75,100 cy unclassified excavation; 8,710 cy undercut excavation; 385,800 cy borrow excavation; 7,310 cy drainage ditch excavation; 58,190 sy removal of existing asphalt pavement; 230 sy removal of existing concrete pavement; 6,590 sy breaking of existing asphalt pavement; 4,010 cy select granular material; 6,370 sy geotextile for soil stabilization; 15,360 sf temporary shoring; 1,720 sy rock plating.
Special DistrictAK
Posted
Oct 2, 2026
Oct 28, 2026
Supply of Fabricated Steel Structures for Kincaid Substation.
Orange Unified School District
School DistrictCA
Posted
Oct 22, 2026
Nov 17, 2026
Orange Unified School District is accepting bids for a re-bid of shade-structure and related concrete site improvements at McPherson Magnet School; this is a construction procurement, not a grant program. The work includes one PC-approved 36-by-47-foot metal shade structure and two 14-by-14-foot fabric shade structures. Bids may be submitted electronically or on paper by November 17, 2026, at 2:00 p.m. Pacific, and attendance at a mandatory pre-bid conference on November 3, 2026, is required.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
446 days before RFP
The capital-project amendment list increased ECP10168, the POD #3 to Simpson Substation 115 kV Transmission Loop, to $8,600,000.
(b) The amounts appropriated for the projects are amended as follows : Proiect Description FCP10245 Admin HVAC Upgrades $1,700,000 $800,000 $2,500,000 ECP10168 POD #3 to Simpson Substation 115 kV Transmission Loop 6,600,000 2,000,000 8,600,000
Greenville Utilities Commission Regular Meeting
Board meeting · May 15, 2025
Board meeting
418 days before RFP
The five-year spending plan lists $5,000,000 for ECP10168 in 2026 and $5,092,807 in 2027.
Five-Year Spending Plan: Electric Fiscal Year 2025--2026 Budget \| Capital Improvements Plan CAPITAL PROJECTS 2026 2027 2028 2029 2030 5-YEAR SPENDING Distribution Substation Transformer Replacement(s) $ 2,000,000 $ 2,000,000 $ 2,000,000 - - $ 6,000,000 ECP10168 - POD #3 to Simpson Substation 115 kV Transmission Loop $ 5,000,000 $ 5,092,807 - - - $…
Greenville Utilities Commission Budget Ordinance
Board meeting · Jun 12, 2025
Board meeting
153 days before RFP
The proposed five-year capital plan listed $4,000,000 for ECP10168 in FY 2027 and $3,996,579 in FY 2028, totaling $7,996,579 for the POD #3 to Simpson Substation 115 kV Transmission Loop.
CAPITAL SPENDING PLAN ELECTRIC CAPITAL PROJECTS 2027 2028 2029 2030 2031 5-Year Spending 1 Hollywood Substation - 115 kV Conversion $0 $3,000,000 $0 $0 $0 $3,000,000 2 ECP10248 - POD Transformer Replacement $0 $0 $4,260,370 $0 $0 $4,260,370 3 ECP10265 - Radial Substation Conversion $300,000 $400,000 $0 $0 $0 $700,000 4 ECP10276 - Boviet Peaking Generators…
Greenville Utilities Commission Finance/Audit Committee Agenda
Board meeting · Mar 4, 2026
Board meeting
75 days before RFP
GUC's Board adopted the FY 2025-26 budget amendment, including a revised $16,000,000 authorization for ECP10168 POD #3 to Simpson Substation 115 kV Transmission Loop; it also adopted a resolution recommending City Council adoption of the reimbursement resolution.
(b) The amounts appropr iated for the projects are amended as follows : 8 ECP10282 - Distribution Substation Transformer Reolacements $6,000,000 $ 9 ECP10168 POD#3 to Simoson Substation 115 kV Transmission Looo 8,600,000 7,400,000 10 ECP10248 - POD Transformer Reola cement 5,000,000 5,800,000 11 WCP10044 - Water COG BUILD Grant 5th St 2,650,000 (1,104,685)…
Greenville Utilities Commission Regular Meeting
Board meeting · May 21, 2026
RFP published
Proposals due (4 days left)
Decision makers connected to this RFP from Greenville Utilities Commission.