Louisiana Division of Administration
State AgencyLA
Jun 30, 2026
Closes
Aug 5, 2026
HVAC Equipment Replacement RFP
HVAC Equipment Replacement.
Description: Edgecombe County is seeking bids from qualified contractors to replace HVAC equipment at the Edgecombe County Law Enforcement Center, Edgecombe County Administration Building, and possibly other county-owned buildings. The project involves removing existing HVAC equipment and installing new units. The solicitation is open and seeking qualified HVAC contractors to submit competitive sealed bids.
County · NC, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Edgecombe County.
Adjacent opportunities open for bidding right now.
Louisiana Division of Administration
State AgencyLA
Jun 30, 2026
Closes
Aug 5, 2026
HVAC Equipment Replacement.
CityMA
Jul 29, 2026
Closes
Aug 19, 2026
The Town of Nantucket, acting through its Nantucket Airport Commission, seeks quotes to replace the HVAC Equipment System at Nantucket Airport. Quotes must be emailed to vilieva@nantucketairport.com, and the public bid opening is scheduled for one minute after the submission deadline. The procurement was published July 29, 2026, closes August 19, 2026 at 2:00 PM, and is identified as an open Request for Quotes rather than a grant program.
Higher EducationOH
-
Closes
Aug 14, 2026
Hocking College is soliciting bids from qualified vendors for HVAC equipment replacement at its campus in Nelsonville, Ohio. The equipment to be replaced includes the Davidson Hall chiller pumps and a 5-ton split system at the Nature Center. Bids must be submitted via email to Bryan Lutz (lutzb10561@hocking.edu) by 1:00 PM on August 14, 2026, and a site visit is required to submit a proposal.
Mar 24, 2026
Closes
Aug 14, 2026
Replace old HVAC equipment from the administrative building and install new HVAC. Removal of all hydronic heating. Removal of all equipment in the mechanical room and any associated electrical. Installation of two new furnaces, coils, and air conditioners with electrical, adapted to existing ducting for North end of building. Installation of nine mini-split heat pump systems for offices, including electrical. Installation of three electric cover heaters with thermostats in the restrooms and safe room, including electrical.