Food Safety and Inspection Service
FederalDC
Posted
Sep 1, 2026
Sep 9, 2026
Quarantine Facility HVAC Replacement - Request for Quotation (RFQ)
Replace the failed HVAC unit of the WRRC quarantine facility.
Description: The Town of Nantucket, acting through its Nantucket Airport Commission, seeks quotes to replace the HVAC Equipment System at Nantucket Airport. Quotes must be emailed to vilieva@nantucketairport.com, and the public bid opening is scheduled for one minute after the submission deadline. The procurement was published July 29, 2026, closes August 19, 2026 at 2:00 PM, and is identified as an open Request for Quotes rather than a grant program.
City · MA, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
Food Safety and Inspection Service
FederalDC
Posted
Sep 1, 2026
Sep 9, 2026
Replace the failed HVAC unit of the WRRC quarantine facility.
CountyUT
Posted
Aug 24, 2026
Sep 8, 2026
Seeking sealed bids from qualified and licensed hvac contractors for replacement of two rooftop hvac units serving the indoor arena and one air-cooled chiller.
FederalNM
Posted
Aug 11, 2026
Sep 4, 2026
Removing the existing central HVAC systems at the Oak Flats Fire Station and the Fox Field ATB Station, and installing modern, energy-efficient, equivalent-in-kind systems. Work includes removal and disposal of existing equipment, pressure testing and leak detection of the existing refrigerant line sets, and installation of new R-454B HVAC systems appropriate for each facility.
Manchester-Boston Regional Airport
Special DistrictNH
Posted
Aug 25, 2026
Sep 22, 2026
HVAC Equipment Replacement Project. The overall Project consists of the replacement of heating ventilation and air conditioning (HVAC) equipment that is located in various areas of the Airport terminal building and the terminal access walkway. The DB Contractor general scope is anticipated to include the final design, procurement, and construction for the phased replacement of 3 large custom packaged DX air handling units (AHUs) that provide HVAC to the terminal building and 5 roof-top DX units (RTUs) that provide HVAC to the terminal access walkway. The AHUs are located on the terminal roof and service 129,000 SF of terminal space. The RTUs are located on the walkway roof and service 17,600 SF of terminal walkway space. The age of the existing equipment ranges between 23 and 28 years old. This Project will replace the equipment with new more energy efficient equipment. The Project may also include replacement of controls components for an upgrade/replacement of the existing building automation / management system (BAS/BMS) if funding permits. The DB contract will consist of base pricing for final design and certain equipment replacement items with a selection of optional additive-alternatives which may be partially selected at the time of contract award (FY-26) or added at a later time during the contract performance, if and when additional funding (FY-27) becomes available.
Decision makers connected to this RFP from Town of Nantucket.