Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Nevada, Missouri is soliciting bids for street improvements including milling existing pavement, installing new asphalt, and placing curb and gutter on specified streets within the city limits. The contract work is expected to start on or before June 1, 2026 and be completed by September 30, 2026, and must comply with Missouri Highway and Transportation Commission standard specifications. Bids are due March 5, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of services for full depth reclamation of street pavement, installation of new bituminous pavement, concrete curb and gutter, and storm sewer maintenance for the 2026 Street Improvements project.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Procurement of services for full depth reclamation of street pavement, installation of new bituminous pavement, concrete curb and gutter, and storm sewer maintenance for the 2026 Street Improvements project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Village of Glenview seeks bids for its 2026 Street Improvements program, including approximately 22,000 SY of HMA pavement resurfacing/rehabilitation. Work also includes storm sewer improvements, curb and gutter, concrete sidewalk and driveway apron replacements, and parkway restoration at various locations. Bids are due via DemandStar on February 5, 2026 at 3:00 PM Central.
Posted Date
Jan 22, 2026
Due Date
Feb 5, 2026
Release: Jan 22, 2026
Close: Feb 5, 2026
The Village of Glenview seeks bids for its 2026 Street Improvements program, including approximately 22,000 SY of HMA pavement resurfacing/rehabilitation. Work also includes storm sewer improvements, curb and gutter, concrete sidewalk and driveway apron replacements, and parkway restoration at various locations. Bids are due via DemandStar on February 5, 2026 at 3:00 PM Central.
AvailableWork consist of Resurface or rehabilitate sidewalks, including: utility cover adjustments: water gate box lowering and raising, tack coat, shim, and overlay; driveway preparation and lawn and driveway restoration; pavement removal, common excavation, aggregate base gravel; erosion and traffic control and cleanup. Hand placed HMA 110 ton; pavement removal 650 SY; remove existing concrete sidewalk 200 SY; fine grade of driveways/sidewalks 850 SY; aggregate base 135 CY; common excavation 135 CY; furnish & install type 1 granite curb 50 LF; reset or adjust existing granite curb 75 LF; loam & seed 475 SY; flaggers 200 HR; F&I detectible warning plates 136 SF.
Posted Date
Feb 3, 2026
Due Date
Feb 3, 2026
Release: Feb 3, 2026
Close: Feb 3, 2026
Work consist of Resurface or rehabilitate sidewalks, including: utility cover adjustments: water gate box lowering and raising, tack coat, shim, and overlay; driveway preparation and lawn and driveway restoration; pavement removal, common excavation, aggregate base gravel; erosion and traffic control and cleanup. Hand placed HMA 110 ton; pavement removal 650 SY; remove existing concrete sidewalk 200 SY; fine grade of driveways/sidewalks 850 SY; aggregate base 135 CY; common excavation 135 CY; furnish & install type 1 granite curb 50 LF; reset or adjust existing granite curb 75 LF; loam & seed 475 SY; flaggers 200 HR; F&I detectible warning plates 136 SF.
AvailableWork will generally include removal of existing improvements, excavation, aggregate base, asphalt milling, asphalt and concrete pavement placement, curb and gutter, concrete approaches, stormwater improvements, concrete sidewalk and surface restoration.
Posted Date
Jan 26, 2026
Due Date
Mar 4, 2026
Release: Jan 26, 2026
Close: Mar 4, 2026
Work will generally include removal of existing improvements, excavation, aggregate base, asphalt milling, asphalt and concrete pavement placement, curb and gutter, concrete approaches, stormwater improvements, concrete sidewalk and surface restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →