Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction access using FODS mat, or approved equal (approximately 200 SF), inlet protection for storm drain catch basins (two total), installation of bio-sock/filter sock at each end of Contractor work area on side of Construction work area and use of 3' x 3' Super Sacks for work area cofferdam protection (including shifting Super Sacks during the construction period); Clearing and grubbing (1,125 SF/0.025 Acres).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Perform stream restoration activities including: Provide machine access to worksites; install temp stream isolation to perform work in the dry; excavate, remove, and grade channel banks and floodplains; install large wood; and place spoils and grade.
Posted Date
Nov 20, 2025
Due Date
Feb 3, 2026
Release: Nov 20, 2025
Close: Feb 3, 2026
Perform stream restoration activities including: Provide machine access to worksites; install temp stream isolation to perform work in the dry; excavate, remove, and grade channel banks and floodplains; install large wood; and place spoils and grade.
AvailableProvide stream restoration work.
Posted Date
Jan 12, 2026
Due Date
Jan 29, 2026
Release: Jan 12, 2026
Close: Jan 29, 2026
Provide stream restoration work.
AvailableProject will restore approx 3,000 lf of stream, extending. It also includes the construction of a parallel concrete trail, pedestrian bridges, and drainage enhancements such as storm drain inlets and outfalls. Additionally, the project will address sewer and water utility improvements and relocations, road work and intersection removal, and extensive planting throughout the stream corridor. Urban stream restoration and realignment. Stream bank and bed rock riprap protection. Retaining wall improvements.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
Project will restore approx 3,000 lf of stream, extending. It also includes the construction of a parallel concrete trail, pedestrian bridges, and drainage enhancements such as storm drain inlets and outfalls. Additionally, the project will address sewer and water utility improvements and relocations, road work and intersection removal, and extensive planting throughout the stream corridor. Urban stream restoration and realignment. Stream bank and bed rock riprap protection. Retaining wall improvements.
Work includes re-alignment of 250-LF of stream channel re-alignment, including filling in of the old channel alignment and floodplain grading; restoring 500-LF of stream channel in place, including floodplain grading; re-alignment of 60-LF of tributary channel, including filling in of the old channel; installation of in-stream grade control features that include boulder vanes, log vanes, boulder riffles, drop structures and boulder sills; stabilization of channel embankment through the use of longitudinal fill stone toe protection and geolifts; seeding and planting.
Posted Date
Jul 25, 2025
Due Date
Jan 27, 2026
Release: Jul 25, 2025
Close: Jan 27, 2026
Work includes re-alignment of 250-LF of stream channel re-alignment, including filling in of the old channel alignment and floodplain grading; restoring 500-LF of stream channel in place, including floodplain grading; re-alignment of 60-LF of tributary channel, including filling in of the old channel; installation of in-stream grade control features that include boulder vanes, log vanes, boulder riffles, drop structures and boulder sills; stabilization of channel embankment through the use of longitudinal fill stone toe protection and geolifts; seeding and planting.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis