CountyLA
Posted
Nov 18, 2026
Dec 11, 2026
Furnish and Install Closed Cell Spray Foam RFP
Provide Labor, Materials, and Equipment Necessary to Furnish and Install Closed Cell Spray Foam for the Jefferson Parish Fire Services Department
Description: The City of Muskogee is soliciting quotations for the supply and professional installation of closed-cell spray foam insulation at the Three Rivers Museum (restored 1916 Midland Valley Railroad Depot) located at 220 Elgin St., Muskogee, OK. The work covers approximately 2,700 square feet of R-panel metal roof deck with a target nominal thickness of 4.0 inches (minimum R-24 to R-28), including substrate preparation, air/vapor sealing, and installation of a code-compliant thermal/fire barrier. The contractor must provide labor, materials, dumpster, follow specific application and cleanup procedures, comply with manufacturer and warranty requirements, and complete the project within seven working days.
City · OK, US
Adjacent opportunities open for bidding right now.
CountyLA
Posted
Nov 18, 2026
Dec 11, 2026
Provide Labor, Materials, and Equipment Necessary to Furnish and Install Closed Cell Spray Foam for the Jefferson Parish Fire Services Department
CityFL
Posted
Oct 26, 2026
Dec 2, 2026
Provide specialized facility maintenance and rehabilitation services to restore the thermal performance, energy efficiency, durability, and service life of the existing Fleet Maintenance Facility closed-cell spray polyurethane foam (SPF) insulation system through the removal of deteriorated insulation and the application of a replacement closed-cell spray polyurethane foam (SPF) insulation system and compatible protective coating while maintaining continuous Fleet Maintenance operations.
Posted
Oct 30, 2026
Nov 30, 2026
3 Ea Cell, fuel, aircraft, National Stock Number 1560017018387.
Posted
Oct 30, 2026
Nov 30, 2026
1 Ea Fuel cell, aircraft, National Stock Number 1680014826919.
Decision makers connected to this RFP from City of Muskogee.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
519 days before RFP
Muscogee Main Street's economic vitality committee reported ongoing energy audits for five city buildings, including the Three Rivers Museum, with results expected in 2025.
So, our economic vitality committee has been working on our Muscogee Main Street Energy project. This is with the assistance of the Oklahoma Main Street Center, the Department of Commerce, and OSU. So, they have been working on five city buildings to do energy audits. and uh those would be City Hall that we're in right now, the Roxy Theater, Civic Center,…
Muscogi Municipal Authority Meeting
Board meeting · Jun 23, 2025
RFP published
Proposals due (7 days left)